Vietnam.vn - Nền tảng quảng bá Việt Nam

Temporary traffic diversion on Cau Gie Expressway

Việt NamViệt Nam03/12/2024


In order to ensure the safe operation of the Cau Gie - Ninh Binh expressway during the construction of the overpass at the Liem Son intersection, Ha Nam province, based on the Decision of the Director of the Vietnam Road Administration, the Vietnam Expressway Corporation (VEC) announces the temporary traffic diversion and organization time of the Cau Gie - Ninh Binh expressway (section Km239+800-Km242+900).

Phân luồng giao thông tạm thời trên cao tốc Cầu Giẽ - Ninh Bình- Ảnh 1.

Temporary traffic diversion on Cau Gie – Ninh Binh expressway from December 6, 2024. Photo: Ngoc Han

Specifically, from December 6, 2024, vehicles traveling on the Cau Gie - Ninh Binh expressway in the direction of Liem Tuyen - Cao Bo will turn right at Km239+800 on the branch road (belonging to the Liem Son Intersection Construction Investment Project), then enter the main expressway at Km242+220 to go to Cao Bo Intersection.

Vehicles traveling on the Cau Gie – Ninh Binh expressway from Cao Bo to Liem Tuyen to Km242+900, turn right onto the branch road (belonging to the Liem Son Intersection Construction Investment Project), then enter the main route of the Cau Gie – Ninh Binh expressway at Km240+500 to go to Liem Tuyen Intersection.

The maximum permitted speed of vehicles on the branch road (project construction area, section Km239+800-Km242+900) must not exceed 60 km/hour.

Gradually reduce speed on Cau Gie - Ninh Binh expressway before entering the branch road (Km239+800-Km242+900) and gradually increase from the branch road entering the expressway.

VEC requires vehicles traveling through the route to pay attention to the road signaling system and instructions of the operating unit on the route.

Vehicles traveling on the Cau Gie - Ninh Binh expressway, when encountering an incident or discovering an unusual event, please contact the operator via HOTLINE 1900 1838 (available 24/7) to receive and handle information promptly.

During the time of traffic diversion and temporary traffic organization on the Cau Gie - Ninh Binh expressway (section Km239+800-Km242+900), the quality of the road will be affected, so VEC hopes to receive sympathy and sharing from traffic participants.

Source: https://nld.com.vn/phan-luong-giao-thong-tam-thoi-tren-cao-toc-cau-gie-ninh-binh-196241203184113197.htm


Comment (0)

No data
No data
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together
Hanoi is strange before storm Wipha makes landfall
Lost in the wild world at the bird garden in Ninh Binh
Pu Luong terraced fields in the pouring water season are breathtakingly beautiful
Asphalt carpets 'sprint' on North-South highway through Gia Lai

Heritage

Figure

Business

No videos available

News

Political System

Local

Product