Vietnam.vn - Nền tảng quảng bá Việt Nam

Investing more than 682 billion VND to "straighten" National Highway 37 through Gia Loc town

Việt NamViệt Nam30/04/2024

d5f3cfa8ab34056a5c25(1).jpg
National Highway 37 through Gia Loc town

According to the resolution, the National Highway 37 bypass project is approximately 5,514 km long. Of which, the section in Gia Loc district is 3,877 km long; the section in Hai Duong city is approximately 1,637 km long.

The starting point of the project connects to National Highway 37 (km45+633) at Thong Nhat Bridge. The end point connects to Ring Road I, Hai Duong City. The route is built according to the scale of a regional street, with a design speed of 50km/hour.

The main road of the area is divided into 2 sections, section 1 (Gia Loc town bypass) has a roadbed width of 18 m, the length of the route is 3.168 km. The intersection with provincial road 395 has a roadbed width of 28 m, the length of the route is 0.150 km. The branch connecting to the Hanoi - Hai Phong expressway and the section from Thong Nhat bridge to the intersection with branch 1 is invested in 1/2 phase with a road surface width of 11 m, roadbed width of 12 m, the length of the route is 1.009 km.

Section 2 (connecting section 1 with Hai Duong City Ring Road I) has a 31m wide roadbed and a length of 1.187km. Synchronously construct intersections, drainage, trees, lighting, signaling systems, other infrastructure and organize traffic safety in accordance with the investment scale.

The project is invested by the Hai Duong Provincial Construction Investment Project Management Board. The total investment of the project is over 682 billion VND. The project implementation period is 2024-2025.

After construction, the Gia Loc town bypass will reduce the load on National Highway 37 through Gia Loc town and at the same time form a connecting route from the center of Gia Loc district to Hai Duong city's beltway I and provincial roads in the area (provincial road 393; provincial road 395; Hanoi - Hai Phong expressway...), gradually completing the regional traffic infrastructure of Gia Loc district and Hai Duong city, creating momentum for local socio -economic development.

See details of the resolution: Here

PV

Source

Comment (0)

No data
No data
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together

Heritage

Figure

Business

No videos available

News

Political System

Local

Product