Vietnam.vn - Nền tảng quảng bá Việt Nam

Strictly handle the situation of arbitrarily dismantling fences on two highways through Binh Thuan and Dong Nai

Báo Giao thôngBáo Giao thông10/03/2024


The Ministry of Transport has just sent a document to the People's Committees of two provinces: Binh Thuan and Dong Nai regarding the situation of arbitrary dismantling of fences and theft of construction assets at the North-South expressway project, Vinh Hao - Phan Thiet and Phan Thiet - Dau Giay sections.

Xử nghiêm tình trạng tự ý tháo dỡ hàng rào trên hai tuyến cao tốc qua Bình Thuận, Đồng Nai- Ảnh 1.

The theft of equipment and materials at lamp posts on the Phan Thiet - Dau Giay expressway was previously reported by Giao Thong Newspaper (Photo: Vinh Phu).

According to the Ministry of Transport , the component projects of Vinh Hao - Phan Thiet and Phan Thiet - Dau Giay sections are assigned to Project Management Board 7 and Thang Long Project Management Board to organize construction and put into operation from May 2023, promoting investment efficiency.

However, according to the report, since the time of putting into operation, there have been many cases of people arbitrarily dismantling fences, bad guys stealing anti-glare panels, materials, electrical equipment in the lighting system... seriously affecting the safety of exploitation and loss of project assets.

Although the investors have sent documents to local authorities for handling, it has not been thoroughly handled yet.

"To ensure the safe exploitation of projects, the People's Committees of the two provinces: Binh Thuan and Dong Nai need to pay attention, direct and urge relevant agencies and units to strengthen propaganda work to the people, promptly take measures to prevent and strictly handle violations of the law, and not let the above situation continue," the Ministry of Transport proposed.

Vinh Hao - Phan Thiet Expressway is 100.8km long, passing through Tuy Phong, Bac Binh, Ham Thuan Bac, Ham Thuan Nam districts of Binh Thuan province. In the phased phase, the expressway is invested with a scale of 4 lanes, roadbed width of 17m.

Phan Thiet - Dau Giay Expressway is 99km long, passing through two provinces: Binh Thuan (nearly 48km), Dong Nai (more than 51km). In the phased phase, the project is invested with a scale of 4 lanes, a roadbed width of 25m, and a design speed of 120km/h.



Source

Comment (0)

No data
No data
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together
Hanoi is strange before storm Wipha makes landfall
Lost in the wild world at the bird garden in Ninh Binh

Heritage

Figure

Business

No videos available

News

Political System

Local

Product