Vietnam.vn - Nền tảng quảng bá Việt Nam

Approval of high-rise social housing project NO3 worth nearly 600 billion VND

The People's Committee of Phu Tho province has just issued a Decision approving the investment policy of the NO3 high-rise social housing project in Minh Phuong Residential and Commercial Service Area, Viet Tri City, Phu Tho Province (now Nong Trang Ward).

Báo Phú ThọBáo Phú Thọ15/07/2025

This is one of the key projects, forming a social housing area with a synchronous system of technical infrastructure works and architectural works of the project; gradually completing housing indicators in Viet Tri city according to the housing development program and plan of Phu Tho province in the period of 2021-2030; meeting the housing needs of beneficiaries of social housing support policies. At the same time, contributing to the completion of the goal of implementing the Project "Investing in the construction of at least 1 million social housing apartments for low-income people and industrial park workers in the period of 2021-2030" approved by the Prime Minister.

The NO3 high-rise social housing project includes: 11 apartment buildings (15 floors) and a security house with beautiful architectural form; public trees and technical infrastructure systems are invested and built synchronously.

Approval of high-rise social housing project NO3 worth nearly 600 billion VND

The low-rise social housing area at lot N02 of Minh Phuong Residential and Commercial Service Area, Nong Trang ward has been completed and is qualified to come into operation.

The total land area of the NO3 High-rise Social Housing Project is 7,175.00m2 (0.7175 ha) approved by the Provincial People's Committee for detailed planning in Decision No. 530/QD-UBND dated March 5, 2025.

The total expected investment capital of the project is 581,238 billion VND. The land use term of the project is 50 years, while home buyers will be able to use the land for a long term. It is expected that the entire project will be built, accepted and put into use in 2028.

In addition, the Provincial People's Committee assigned the Department of Construction to preside over and coordinate with relevant departments and agencies to organize the selection of investors, while closely monitoring the progress and quality of implementation. The Department of Agriculture and Environment is responsible for land allocation and leasing procedures and controlling compliance with environmental protection regulations.

For the selected investors, the People's Committee of Phu Tho province requires them to complete all investment procedures, ensure construction progress, project quality and fulfill all financial obligations, and at the same time propose an effective project management and operation plan after putting into use.

Bao Thoa

Source: https://baophutho.vn/chap-thuan-du-an-nha-o-xa-hoi-cao-tang-no3-gan-600-ty-dong-236165.htm


Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product