Vietnam.vn - Nền tảng quảng bá Việt Nam

Groundbreaking ceremony for nearly 1,500 billion VND road connecting Long Thanh airport

Báo Tuổi TrẻBáo Tuổi Trẻ09/01/2025

The provincial road 25B upgrade project will directly connect Nhon Trach urban area with Long Thanh airport via National Highway 51 and T1 route.


Động thổ tuyến đường gần 1.500 tỉ kết nối sân bay Long Thành - Ảnh 1.

Construction machinery performs groundbreaking ceremony of the project - Photo: AB

On January 9, the Dong Nai Province Traffic Construction Investment Project Management Board held a groundbreaking ceremony for the project to upgrade Provincial Road 25B, from the center of Nhon Trach district to National Highway 51.

The provincial road 25B upgrade project is over 9.2km long, passing through Nhon Trach and Long Thanh districts. The starting point is at Km0+000 intersecting with National Highway 51 (Long Thanh district), the ending point is at Km9+290 (center of Nhon Trach district).

The cross-section of the completed route is 80m, with a total investment of nearly 1,500 billion VND. According to the plan, the project will be basically completed in 2025 and put into synchronous operation from 2026.

According to the Dong Nai Province Traffic Construction Investment Project Management Board, Provincial Road 25B is an important road, gradually completing infrastructure, contributing to socio-economic development according to the general planning orientation of Nhon Trach new urban area.

In particular, through National Highway 51, Provincial Road 25B directly connects Nhon Trach urban area with Long Thanh airport, expected to be put into operation in 2026.

In the planning of Long Thanh airport project, two connecting roads T1 and T2 play a role in connecting the main traffic axes in the area with the airport. In which T1 will connect with National Highway 51 and two provincial roads 25B, 25C.

Then continue to connect with Ben Luc - Long Thanh expressway and Ho Chi Minh City Ring Road 3 which are being invested in construction, creating more traffic connections for Long Thanh airport.

From there, it plays a role in connecting Long Thanh airport with Ho Chi Minh City and other provinces in the region. At the same time, it shares traffic pressure for the Ho Chi Minh City - Long Thanh - Dau Giay Expressway and National Highway 51.

In early January 2024, the People's Committee of Nhon Trach district (Dong Nai province) started construction of 3 traffic projects including phase 1 of road 25C (section 2), Ton Duc Thang street (road 25B) and extended Le Hong Phong street.

The total investment capital of the 3 projects is over 2,000 billion VND. When completed, it will connect important roads in the area such as Ho Chi Minh City Ring Road 3, the road to Phuoc An port and especially Long Thanh airport.



Source: https://tuoitre.vn/dong-tho-duong-gan-1-500-ti-ket-noi-san-bay-long-thanh-20250109104625768.htm

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product