Vietnam.vn - Nền tảng quảng bá Việt Nam

More than 3,700 billion VND to build a bridge connecting South Saigon with the center

VnExpressVnExpress09/11/2023


Nguyen Khoi Bridge - Road over Te Canal, Ben Nghe Canal, connecting Districts 7, 4, 1, is expected to receive more than 3,700 billion VND investment from the city to reduce traffic congestion at the southern gateway.

This is one of 10 projects that the Department of Transport has just sent to the Ho Chi Minh City People's Committee for consideration and submission to the City People's Council for approval of investment policy adjustments at the upcoming thematic meeting.

The Nguyen Khoi bridge and road project is proposed to be adjusted due to changes in scale, leading to an increase in total investment to VND3,725 billion, compared to the approved level of VND1,250 billion 7 years ago. If approved, the project is expected to start construction in the fourth quarter of 2024 and be completed in 3 years.

Perspective of Nguyen Khoi bridge and street connecting districts 7, 4 and 1. Photo: Ho Chi Minh City Department of Transport

Perspective of Nguyen Khoi bridge and street connecting districts 7, 4 and 1. Photo: Ho Chi Minh City Department of Transport

According to the pre-feasibility study report of the project adjustment, the total length of Nguyen Khoi bridge - road is nearly 5 km. Of which, the bridge part is about 2.5 km long, 6.5-25.5 m wide; the road part is more than 2.3 km long, 26.5-61.5 m wide.

The project will start from D1 Street (connecting Saigon University with Nguyen Van Linh Street and Him Lam residential area, District 7), then the main bridge will cross the Te Canal on an elevated viaduct along Nguyen Khoi Street. The bridge will continue to cross Ben Nghe Canal to connect to Vo Van Kiet Street, District 1, following two branches N7 and N8. Other branches will also be built connecting through District 4.

According to the above plan, Nguyen Khoi bridge - road will reduce congestion for internal routes of District 4, share traffic pressure with roads from District 7, 8, Nha Be district to the city center such as Khanh Hoi - Kenh Te bridge - Nguyen Huu Tho, Nguyen Van Cu bridge - Duong Ba Trac.

Currently, traffic connections between the South and the center of Ho Chi Minh City are mainly via Nguyen Huu Tho - Kenh Te bridge and Tan Thuan - Nguyen Tat Thanh bridge. These routes are all seriously overloaded, leading to frequent traffic jams.

In addition to Nguyen Khoi bridge and road, at the upcoming session of the City People's Council, a series of other projects are expected to be approved for investment, including: Ring Road 2, section from Vo Nguyen Giap to Pham Van Dong (total capital of more than 4,500 billion VND); upgrading and expanding Nguyen Thi Dinh road, section from Giong Ong To bridge to My Thuy roundabout (nearly 2,100 billion VND); expanding Do Xuan Hop road (862 billion); expanding Vinh Loc road (Binh Chanh district), total capital of more than 4,300 billion VND...

Gia Minh



Source link

Comment (0)

No data
No data
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together
Hanoi is strange before storm Wipha makes landfall
Lost in the wild world at the bird garden in Ninh Binh
Pu Luong terraced fields in the pouring water season are breathtakingly beautiful
Asphalt carpets 'sprint' on North-South highway through Gia Lai

Heritage

Figure

Business

No videos available

News

Political System

Local

Product