Vietnam.vn - Nền tảng quảng bá Việt Nam

Intel receives $400 million machine from ASML, ready for super powerful chips

Báo Thanh niênBáo Thanh niên23/12/2023


According to PhoneArena , TSMC and Samsung Foundry are expected to start mass producing 2nm chips in 2025, which means that 1.8nm chips will allow Intel to take the lead in chip manufacturing processes. Intel is said to spend between $300 million and $400 million per EUV High-NA machine.

Intel nhận cỗ máy 400 triệu USD từ ASML, sẵn sàng cho chip siêu mạnh- Ảnh 1.

Each ASML High-NA machine costs at least $300 million.

“We are shipping the first High-NA system and announced this in a social media post. The system will be delivered to Intel as planned as previously announced,” ASML said of the delivery.

With a High-NA system, the higher the NA number, the higher the resolution of the pattern etched onto the silicon wafer. While current EUV machines have a .33 aperture (equivalent to 13nm resolution), a High-NA machine has a .55 aperture (equivalent to 8nm resolution). With the higher resolution pattern transferred to the wafer, the foundry may not need to run the wafer through the EUV machine twice to add additional features, saving both time and money.

High-NA EUV machines mainly focus on reducing the size of transistors and increasing the density to pack more transistors inside a chip. The higher the number of transistors on a chip, the more powerful and energy efficient it is. With High-NA machines, transistors can be shrunk 1.7 times with a 2.9 times increase in density.

Intel nhận cỗ máy 400 triệu USD từ ASML, sẵn sàng cho chip siêu mạnh- Ảnh 2.

Each High-NA machine is shipped by ASML in 13 large containers

The new version of the High-NA EUV machine will help make chips 2nm and below. Just last week, TSMC and Samsung Foundry addressed their post-2nm roadmap. The two plan to develop semiconductors using the 1.4nm process by 2027. Production of 2nm chips is expected to begin in 2025, and a few days ago, TSMC allowed Apple to evaluate 2nm chip prototypes.

Transporting the EUV High-NA machine was no easy task as it was divided into 13 large containers and 250 crates. The assembly of the machine was also extremely difficult.



Source link

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product