Vietnam.vn - Nền tảng quảng bá Việt Nam

PC Lao Cai rehearses electricity supply plan for summer 2024

Việt NamViệt Nam10/05/2024

On May 9, Lao Cai Power Company (PC Lao Cai ) organized a summer power supply drill in 2024.

During the drill, the total capacity of the Lao Cai power system was significantly reduced, from 312.3MW to 246.4MW (a decrease of 65.9MW). This was achieved thanks to the cooperation between Lao Cai Power Company and 65 customers who signed a commitment to implement the non-commercial load adjustment (DR) program to reduce capacity by 52.56MW.

1.png
Representatives of the Department of Industry and Trade and Lao Cai Electricity Company attended the rehearsal.

In addition, PC Lao Cai has coordinated with 24 customers using Diesel generators to conduct a self-generation grid separation exercise to supply electricity to loads, reducing 4.7MW.

With careful preparation, PC Lao Cai has implemented a flexible and creative drill plan, not only helping to successfully reduce the load but also increasing the efficiency of electricity use. This is a remarkable result of the continuous efforts to ensure electricity supply in the summer of 2024, thereby contributing to ensuring energy security and stabilizing the grid in the context of high electricity demand.

2.png
The Moderators – PC Lao Cai conducted the rehearsal.

According to the leader of PC Lao Cai, with the goal of not having a shortage of electricity in production and daily life by 2024 as directed by the Prime Minister, PC Lao Cai continues to commit to making continuous efforts to provide stable electricity, meeting the increasing needs of people and businesses, while contributing to the socio -economic development of Lao Cai province in particular and the whole country in general.

In weather conditions that may experience extreme heat in the summer (from May to August), increased electricity consumption may lead to a shortage of peak power supply during the hours of 12-15h and 21-24h every day, so practicing power supply plans to respond to all possible situations will help PC Lao Cai ensure electricity supply to customers.


Source

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product