Vietnam.vn - Nền tảng quảng bá Việt Nam

Prime Minister agrees to build a river tunnel connecting Ho Chi Minh City with Dong Nai

VTC NewsVTC News04/12/2024


During the report to Prime Minister Pham Minh Chinh on the progress of the Long Thanh airport project and Bien Hoa - Vung Tau expressway, Chairman of Dong Nai Provincial People's Committee - Vo Tan Duc proposed that the Prime Minister approve the plan to build a tunnel across Dong Nai River connecting Dong Nai with Ho Chi Minh City instead of the plan to build Cat Lai bridge.

Prime Minister Pham Minh Chinh agreed to the plan to build a river tunnel to replace Cat Lai bridge.

Prime Minister Pham Minh Chinh agreed to the plan to build a river tunnel to replace Cat Lai bridge.

Previously, at the working session with the Dong Nai Provincial People's Committee, Fecon Joint Stock Company and its partner Shanghai Tunnel Engineering Co.STEC also proposed two options for building a tunnel across the Dong Nai River with open tunnels in Ho Chi Minh City and Dong Nai, along with a closed tunnel across the river. Both options were proposed to have two parallel tunnels.

Specifically, in option 1, Fecon Joint Stock Company proposed an 8-lane plan with 4 lanes per tunnel, designed speed of 80 km/h. With this plan, the route length is more than 2.3 km. As for option 2, the unit proposed a scale of 6 lanes with 3 lanes per tunnel. The route length is more than 1.7 km.

Regarding the proposal of the Chairman of Dong Nai Provincial People's Committee, Prime Minister Pham Minh Chinh agreed with the plan to build a river tunnel instead of the plan to build a bridge in the Cat Lai area connecting Dong Nai and Ho Chi Minh City.

Also during the meeting, the Prime Minister agreed to the policy of upgrading the Ho Chi Minh City - Long Thanh - Dau Giay Expressway to 10 lanes. At the same time, Deputy Prime Minister Ho Duc Phoc was assigned to directly direct the capital source of the Vietnam Expressway Corporation (VEC) in expanding the Ho Chi Minh City - Long Thanh Expressway and report to the Prime Minister on the solution before December 15; complete the documents submitted to the National Assembly in December.

Luong Y


Source: https://vtcnews.vn/thu-tuong-dong-nai-ar911325.html

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product