Vietnam.vn - Nền tảng quảng bá Việt Nam

Tuyen Quang Hydropower Plant stops releasing floodwaters, Thac Ba Hydropower Plant maintains 2 discharge gates

Báo Kinh tế và Đô thịBáo Kinh tế và Đô thị17/09/2024


Hydropower plant stops releasing flood water from 10:00 on September 17, 2024.
Hydropower plant stops releasing flood water from 10:00 on September 17, 2024.

Monitoring data shows that at 8:00 a.m. on September 17, 2024, the upstream water level of Tuyen Quang Lake was at 116.79 m; inflow to the lake was 1,002 m 3 /s, discharge was 1,216 m 3 /s.

In accordance with the provisions of Article 12 of the Inter-reservoir Operation Procedures in the Red River Basin, the Ministry of Agriculture and Rural Development has sent a telegram to Tuyen Quang Hydropower Company. Accordingly, the company closed the remaining bottom spillway gate of Tuyen Quang Hydropower Reservoir at 10:00 a.m. on September 17, 2024.

Tuyen Quang Hydropower Company is currently closely monitoring the developments of floods, construction safety, flow to the reservoir, upstream and downstream water levels of the reservoir to promptly report to the Ministry of Agriculture and Rural Development according to regulations.

Thus, as of 10:00 a.m. on September 17, on the Red River basin, only Thac Ba Hydropower Joint Stock Company is still opening 2 spillway gates. Currently, the water level on the Red River is also decreasing rapidly; the flooding situation in the riverside localities of Hanoi is no longer a concern.

On the same morning, the Ministry of Agriculture and Rural Development sent a dispatch to four provinces and cities: Tuyen Quang, Phu Tho, Vinh Phuc and Hanoi, requesting the implementation of response solutions when operating the Tuyen Quang hydropower reservoir. In particular, special attention should be paid to ensuring safety for economic activities along the river and on the Red River.



Source: https://kinhtedothi.vn/thuy-dien-tuyen-quang-ngung-xa-lu-thuy-dien-thac-ba-duy-tri-2-cua-xa.html

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product