Vietnam.vn - Nền tảng quảng bá Việt Nam

Affected more than 4,000 households

Người Lao ĐộngNgười Lao Động21/03/2025

(NLDO) - About 4,134 households with a population of about 15,101 people will be affected when the Hang Xanh area is compacted.


Ho Chi Minh City Infrastructure Investment Joint Stock Company (CII) has just sent a report to the Ho Chi Minh City People's Committee and the Department of Transport and Public Works (GTCC) on the implementation status of the TOD urban beautification project in the Hang Xanh area, Binh Thanh district.

Previously, CII proposed the idea of implementing the TOD project to improve the urban area of Hang Xanh. The Ho Chi Minh City People's Committee assigned CII to use its capital to hire consultants to complete the study.

According to CII, through survey and data collection, the area planned to implement the project is estimated to need to reclaim more than 500,000 m2 of land. Of which, residential land accounts for more than 282,000 m2 , and green traffic land accounts for more than 134,000 m2 .

Regarding affected households, there are about 4,134 households in the area with a population of about 15,101 people. In addition, this area has many medium voltage power grids, underground and many transformer stations, telecommunication cables, etc.

Làm đô thị nén khu vực Hàng Xanh: Ảnh hưởng hơn 4.000 hộ dân- Ảnh 1.

Hang Xanh area is often congested with traffic (Photo: Ngoc Quy)

CII has approved the proposal for Arup Vietnam Co., Ltd. to provide conceptual planning services for the Hang Xanh TOD project. The consulting cost is approximately VND 15.3 billion. CII continues to discuss and sign a contract in March 2025 to implement the project.

At the same time, CII is working with BR Design Consulting Co., Ltd., VTCO Investment Co., Ltd., and Lap Viet Construction Investment Consulting Joint Stock Company to study the project's technical infrastructure and urban planning in the project area.

According to CII's previous proposal, the scope of TOD research is from Hang Xanh intersection to Binh Trieu, with a total preliminary investment of about 216,000 billion VND. The project's goal is to solve traffic congestion and increase traffic connectivity for the Hang Xanh area and Binh Trieu bridge.

The project also proposes to develop underground space, build key projects, high-rise buildings, green areas, cultural, sports, medical , commercial and service areas... combined with smart transportation applications to optimize travel and limit environmental impact.



Source: https://nld.com.vn/lam-do-thi-nen-khu-vuc-hang-xanh-anh-huong-hon-4000-ho-dan-19625032118312269.htm

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product