Vietnam.vn - Nền tảng quảng bá Việt Nam

Started building cable-stayed bridge worth over 3,900 billion, the 2nd largest in Vietnam

Việt NamViệt Nam10/12/2024


The Dai Ngai crane construction investment project is located on National Highway 60 with a length of 15 km, starting at the intersection with National Highway 54 in Hung Hoa Commune, Tieu Can District, Tra Vinh Province; ending at the intersection with Nam Song Hau National Highway through Long Duc Commune, Long Phu District, Soc Trang Province. The total investment of the project is 7,962 billion VND, from the state budget, with 2 main bridges, Dai Ngai Bridge 1 and Dai Ngai Bridge 2, invested by Project Management Board 85.

Construction of cable-stayed bridge worth over 3,900 billion, the second largest in Vietnam, begins photo 1

Delegates perform the ceremony to launch the construction of Dai Ngai 1 bridge.

The Dai Ngai 1 bridge and the approach roads at both ends of the bridge have a total construction value of more than 3,900 billion VND. Of which, the main bridge is nearly 2.6 km long, 21.5 m wide, crossing the Dinh An channel of the Hau River. The main bridge is designed as a cable-stayed bridge, with 2 A-shaped towers 110 m high (from the bridge deck). Expected completion in June 2028.

When completed, Dai Ngai Bridge, together with Rach Mieu Bridge, Ham Luong Bridge, and Co Chien Bridge, will improve the transportation capacity of the Mekong Delta, creating convenient traffic connections between the southern coastal provinces and Ho Chi Minh City, shortening travel time, reducing transportation costs, and expanding trade. According to calculations, this traffic route will help shorten about 80km compared to National Highway 1A when traveling from Ca Mau, Soc Trang , Bac Lieu to Ho Chi Minh City.

Started building cable-stayed bridge worth over 3,900 billion, the 2nd largest in Vietnam photo 2 Perspective of Dai Ngai bridge in the future.

A representative of Deo Ca Group - the joint venture contractor - said that immediately after winning the bid, the contractor deployed personnel to the site, built a project management office, and mobilized specialized machinery and equipment to the site to begin construction immediately after the ceremony.

Source: https://tienphong.vn/bat-dau-xay-cau-day-vang-hon-3900-ty-lon-thu-2-viet-nam-post1698903.tpo


Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product