Vietnam.vn - Nền tảng quảng bá Việt Nam

Close-up of workers covering 5 layers of roof of Long Thanh airport passenger terminal

Báo Giao thôngBáo Giao thông09/01/2025

The joint venture contractor mobilized teams of highly skilled workers to cover the roof of the Long Thanh airport passenger terminal. This is a very important item of the entire project.


According to engineers, the station roof has 5 layers, each layer must be constructed according to the correct technical process, with high precision. When installing the roof, it is carefully checked for flatness, tightness and weather resistance. "Each roof layer plays an important role such as insulation, waterproofing, protecting the surface to ensure durability... When a layer is installed, it will be necessary to measure and align until it is correct before the new position can be covered", said Mr. Nguyen Van Tam, a roofing contractor.



Source: https://www.baogiaothong.vn/muc-so-thi-lop-5-lop-mai-nha-ga-hanh-khach-sieu-san-bay-long-thanh-19225010821380564.htm

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product