Vietnam.vn - Nền tảng quảng bá Việt Nam

There needs to be a highway connecting to the coastal road DT.716.

Việt NamViệt Nam25/01/2024


DT.711 Road is a very important cross-road from Thuan Hoa (Ham Thuan Bac) to Mui Ne (Phan Thiet City), connecting 3 national vertical axes through the province including National Highway 28, National Highway 1A and national coastal axis DT.716.

coastal-road-mui-ne-hoa-thang-anh-n.-lan-4-.jpg

The route plays a role in regulating traffic between vertical axes; connecting the North-South Eastern Expressway - National Highway 1A - National Highway 28 with the national coastal axis and Mui Ne National Tourist Area with Phan Thiet airport and important coastal urban areas of the province. The DT.711 route combined with National Highway 28 forms an external traffic route, connecting Binh Thuan with Lam Dong and the Central Highlands provinces, creating a driving force for the development of the Ho Chi Minh City - Lam Dong - Binh Thuan tourism triangle, which is of particular importance in promoting rapid and sustainable socio-economic development of the inter-region. At the same time, this is also the axis connecting the Southern Central Highlands region with the Binh Thuan coastal defense line, thus playing an important role in the task of ensuring national security and defense. The investment scale of the route length is about 33.5 km, of which the existing DT.711 route is 10.5 km long (of which the section from the expressway to National Highway 28 is about 5.75 km and the section to National Highway 1A is about 4.75 km). The starting point of the route intersects with National Highway 28 at Km31+507 in Thuan Hoa commune, Ham Thuan Bac district, the end point intersects with National Highway 1A at about Km1678+580 in Hong Son commune, Ham Thuan Bac district. The extended DT.711 route is about 23 km long. The starting point connects the existing DT.711 with National Highway 1 at Km1678+580, the end point intersects with the coastal road DT.716 in Mui Ne ward, Phan Thiet city. The expected investment scale of the grade III road, the road surface has at least 2 lanes for motor vehicles, the total investment is about 920 billion VND.

To build the road, the Provincial People's Committee has proposed the Central Government to support capital and investment progress at the end of the 2021-2025 period, transitioning to the 2026-2030 period.


Source

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product