Vietnam.vn - Nền tảng quảng bá Việt Nam

Cam Lam-Vinh Hao Expressway officially put into operation from April 26

Việt NamViệt Nam25/04/2024

On April 24, a representative of Cam Lam-Vinh Hao Expressway Joint Stock Company (Project Enterprise) said that Cam Lam-Vinh Hao Expressway will officially open the route and put it into operation to serve people traveling in both directions on the route starting from 7:00 a.m. on April 26 to serve people's travel needs during the April 30 and May 1 holidays.

According to the traffic organization plan, vehicles not allowed on the Cam Lam - Vinh Hao expressway include vehicles carrying toxic, flammable, explosive materials; specialized motorbikes with a design speed of less than 60 km/h, tractors, motorbikes, motorbikes... The investor has also built a temporary rest stop on the expressway at km113, through Nhi Ha commune, Thuan Nam district to serve people and vehicles while waiting for the official station investment. It is known that from April 26 to May 1, vehicles traveling on the route will not be charged a fee, after which it is expected to collect fees from May 2, 2024.

From 7:00 a.m. on April 26, Cam Lam - Vinh Hao expressway officially allows traffic on the route.

The expressway has an intelligent transportation system (ITS) and a synchronous management and operation team for the entire route. In particular, the route has a special tunnel of 2.25 km in length, phase 1 of which uses a two-way traffic tunnel. The tunnel operation center includes a monitoring and control complex controlled by ITS systems, playing an important role in ensuring safety and smooth traffic. Surveillance cameras installed along the route use AI technology to classify vehicles, recognize license plates, detect and warn of incidents and violations such as speeding, driving in the wrong lane, going in the wrong direction, etc. Images of vehicles are collected via cameras and transmitted to the operation center in real time for rescue, disaster relief, and violation handling.

At the meeting to inspect the acceptance of the Cam Lam - Vinh Hao Expressway on April 20, the localities also requested that the project soon coordinate with the Traffic Police Department to issue fines via the ITS system to limit traffic violations. On April 20, 2024, the State Inspection Council for Construction Acceptance approved the acceptance results of the Cam Lam - Vinh Hao Expressway project as qualified for operation and use.


Source

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product