Vietnam.vn - Nền tảng quảng bá Việt Nam

Proposing competent authority to prepare dossier for Ring Road 4 Project

Việt NamViệt Nam04/10/2024


Proposing competent authorities to prepare documents for Ring Road 4 Project - Ho Chi Minh City

According to the plan, the total length of the entire Ho Chi Minh City Ring Road 4 is about 206.72 km, of which Ba Ria - Vung Tau is 18.23 km, Binh Duong is 47.95 km, Ho Chi Minh City is 16.7 km, Long An is 78.3 km.

Route of Ho Chi Minh City Ring Road 4. Photo: Ho Chi Minh City Department of Transport.
Route of Ho Chi Minh City Ring Road 4. (Photo: Ho Chi Minh City Department of Transport).

The Ho Chi Minh City People's Committee has just sent a document to the Prime Minister, the Ministry of Planning and Investment, and the Ministry of Transport on assigning competent agencies to organize the preparation of a Pre-Feasibility Study Report for the Ho Chi Minh City Ring Road 4 Construction Project.

Accordingly, the Ho Chi Minh City People's Committee proposed that the Prime Minister consider approving the policy of preparing the Pre-Feasibility Study Report for the Ho Chi Minh City Ring Road 4 Construction Project and study and propose specific mechanisms and policies applicable to the entire Ho Chi Minh City Ring Road 4.

The Ho Chi Minh City People's Committee also proposed that this locality be the competent authority to preside over and coordinate with the Provincial People's Committees (Binh Duong, Dong Nai, Long An, Ba Ria - Vung Tau) and related units to organize the preparation of the Pre-Feasibility Study Report of the Ho Chi Minh City Ring Road 4 Construction Project according to regulations to report, submit to competent authorities for appraisal, and submit to the National Assembly for decision on investment policy in the last session of 2024.

The Ho Chi Minh City People's Committee also proposed to assign the Ministry of Transport to perform the specialized State management function for the Ho Chi Minh City Ring Road 4 Construction Project; promptly coordinate and guide relevant localities during the implementation process, ensuring synchronization, efficiency and compliance with legal regulations.

Assign the Ministry of Planning and Investment to urgently advise the Prime Minister to establish a State Appraisal Council to appraise the Project's Pre-Feasibility Study Report and organize the appraisal according to regulations; advise the Prime Minister to balance and arrange central budget capital to participate in the Ho Chi Minh City Ring Road 4 construction project.

Previously, at the end of August 2024, the Ho Chi Minh City People's Committee reported to the Prime Minister on the submission of the overall pre-feasibility study report for the Ho Chi Minh City Ring Road 4 construction project. The entire route is 207km long, phase 1 will build 4 lanes, with emergency lanes arranged continuously and a median strip between the two directions of traffic. This phase will also clear the land at once according to the 8-lane plan to facilitate future expansion.

The total investment for the Ho Chi Minh City Ring Road 4 construction project is estimated at VND128,063 billion. Of which, the Ho Chi Minh City section is 17.3km long (VND14,089 billion); the section through Ba Ria - Vung Tau is 18.1km long (VND7,972 billion); the section through Dong Nai is 45.6km long (VND19,151 billion); the section through Binh Duong province is 47.5km long (VND19,827 billion); the section through Long An province is more than 78km long (VND67,024 billion).

Source: https://baodautu.vn/de-xuat-co-quan-co-tham-quyen-lap-ho-so-du-an-vanh-dai-4—tphcm-d226445.html


Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product