Vietnam.vn - Nền tảng quảng bá Việt Nam

Adjusting the planning of Nam O Eco-tourism Area

Việt NamViệt Nam10/01/2025


(NLDO) – The Nam O eco- tourism area in Da Nang has had its planning adjusted due to construction encroaching on the safety corridor of the Nam O railway bridge.

Recently, Mr. Le Quang Nam, Vice Chairman of Da Nang City People's Committee, has just signed a decision approving the local adjustment of the detailed planning 1/500 of Nam O Eco-tourism Area.

Accordingly, the total area of the planning adjustment study is more than 136,000 m2. The adjustment content is to specifically determine the railway safety corridor and the protection area of the Nam O railway bridge, then rearrange the project's works and adjust some land use indicators.

Điều chỉnh quy hoạch Khu du lịch sinh thái Nam Ô- Ảnh 1.

Nam O eco-tourism project's planning was adjusted due to encroachment on railway safety corridor.

Specifically, the southwest area of the project adjusted the land area of the railway safety corridor from 7,055 m2 to 12,444.5 m2.

Adjust the location of the parking lot (P4) from the northern side of the residential area to the southern side (P5) of the Nam O railway bridge protection area. At the same time, a parking lot should be arranged near the railway bridge protection area instead of a high-rise building as before to ensure safety.

For land for tourism service projects, adjust the total area from 65,314 m2 to 66,783 m2; adjust the location of the tourist apartment plots with symbols A7-1, A7-2 to the Southeast.

Adjust the hotel land lot with symbol A1 from the west of the project to the sea bordering the west of Nam O rapids. Reduce the area of public green space, lakes and roads due to the impact of increasing the area of the railway safety corridor and the protection range of Nam O railway bridge.

In the Southeast area, the project adjusted the total land area for tourism service works from 21,669 m2 to 20,200 m2. Increase the area of green land for public use and traffic roads at the project entrance to create an airy landscape.

Trung Thuy - Da Nang Joint Stock Company (project investor) is responsible for the accuracy of data and documents shown in the detailed planning adjustment dossier.

As reported, Quang Nam - Da Nang Railway Joint Stock Company has a document stating that the Nam O Eco-tourism project is built within the protection area of the Nam O railway bridge.

Specifically, the project's construction of stone embankments, site leveling, bored pile construction machinery, etc. has encroached on the safety corridor of the Nam O bridge railway.

After inspecting the scene, the inspection team drew up a record requesting the investor to suspend construction of works violating the protection area of Nam O bridge.



Source: https://nld.com.vn/dieu-chinh-quy-hoach-khu-du-lich-sinh-thai-nam-o-196250110151403849.htm


Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product