Vietnam.vn - Nền tảng quảng bá Việt Nam

Phan Thiet - Dau Giay Expressway Project: Preparing to start construction of additional and additional items

Thang Long Project Management Board (Ministry of Construction) has sent a notice to the People's Committees and Departments of Construction of Dong Nai and Binh Thuan provinces about the commencement of construction of project items and construction works.

Báo Đồng NaiBáo Đồng Nai24/06/2025

Accordingly, the Thang Long Project Management Board said that the unit is preparing to start construction of package 6-XL, constructing additional items, supplementing the section through Binh Thuan and Dong Nai provinces under the Phan Thiet - Dau Giay section construction investment component project under the Project to build some expressway sections on the North - South East route in the period 2017-2020.

Specifically, the 6-XL package will include the main items of construction of a number of residential access roads as proposed by localities with a total length of nearly 28km, including more than 13km in Binh Thuan province and more than 14km in Dong Nai province, to ensure smooth traffic and minimize the separation of residential communities on both sides of the route. In terms of scale, the normal sections are built according to the scale of grade B rural roads; some sections connecting cross-roads and bridgehead roads are built at the scale of grade IV and V plain roads, consistent with the scale of the current road.

Along with that, the package also builds the Ba River bridge in Binh Thuan province, drainage works, protection and traffic safety systems, and a U-turn road on the route.

According to the Thang Long Project Management Board, the package is expected to start construction on June 26, with a construction period of 240 days.

Le Van

Source: https://baodongnai.com.vn/kinh-te/202506/du-an-duong-cao-toc-phan-thiet-dau-giay-chuan-bi-khoi-cong-hang-muc-phat-sinh-bo-sung-be0135d/


Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product