Vietnam.vn - Nền tảng quảng bá Việt Nam

The road along the Western Canal intersecting with Provincial Road 825 is damaged and degraded.

After receiving feedback from people about the damaged road surface between Tay Canal and Provincial Road (DT) 825, in the area of Duc Hoa Ha and Duc Hoa Dong communes, Duc Hoa district, the Department of Construction of Long An province directed inspection and handling to ensure safety for people and vehicles.

Báo Long AnBáo Long An23/06/2025

People complain about damaged road surface

Recently, the road along the Western Canal, especially the intersection between the Western Canal and Provincial Road 825, has been damaged.

Potholes and subsidence make it difficult for people to travel, posing a potential risk to traffic safety, especially during times of heavy rain and slippery road surfaces.

Recently, upon receiving feedback from the people, the Department of Construction has promptly taken action. In the immediate future, the Department has directed the Inland Waterways Port Authority, the unit managing the route, to patch the road surface with crushed stone. This is to ensure temporary traffic, limit accidents and risks while waiting for a long-term repair plan.

However, due to the rainy weather for many days, the asphalt road surface could not maintain its durability, continued to deteriorate and became slippery, affecting traffic.

Faced with that situation, the Department of Construction continues to request road management units to strengthen inspection and supervision of the current status of the route, promptly detect and handle damaged points.

"This road is damaged and bumpy, making it difficult for people and vehicles to travel. In particular, there are many heavy trucks coming in and out to transport goods, so this damage can easily cause major damage. Not only that, the damaged road also poses many potential risks of traffic accidents," said Mr. Le Van Duong, a resident living near the road.

A representative of the Department of Construction said that they have requested the Inland Waterways Port Authority to organize regular maintenance and promptly patch up potholes to prevent accidents due to degraded road surfaces.

In addition, long-term repair options are also being researched and implemented in the near future.

According to people, the damaged road surface poses many potential traffic accident risks.

According to the plan, in the long term, the Department of Construction is carrying out a major repair project for the road section at the intersection between the Tay Canal and DT825.

The repair plan will use cement concrete structure to increase durability, suitable for weather conditions and traffic volume regularly passing through this area.

This is a fundamental solution to improve traffic infrastructure, ensuring safety and smooth traffic for people traveling on important roads along the canal./.

Le Duc

Source: https://baolongan.vn/duong-cap-kenh-tay-giao-voi-duong-tinh-825-hu-hong-xuong-cap-a197518.html


Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product