Vietnam.vn - Nền tảng quảng bá Việt Nam

Le Quang Dao Street before temporary opening date

Báo Tiền PhongBáo Tiền Phong20/01/2025

TPO - The Le Quang Dao extended road project is 2.673km long, with a design speed of 60km/h. Currently, the section from Thang Long Avenue to the end of the intersection with Dai Mo Street, about 1.9km long, has been completed. Tu Liem District People's Committee will temporarily put this section into use to reduce traffic congestion.


TPO - The Le Quang Dao extended road project is 2.673km long, with a design speed of 60km/h. Currently, the section from Thang Long Avenue to the end of the intersection with Dai Mo Street, about 1.9km long, has been completed. Tu Liem District People's Committee will temporarily put this section into use to reduce traffic congestion.

Le Quang Dao Street before temporary opening day photo 1

The Hanoi Department of Transport has just approved the temporary operation of a 2km section of the Le Quang Dao extended road project to reduce traffic congestion. The Department of Transport has proposed a plan to temporarily use this section of the road to the Hanoi People's Committee. It is expected that this road will be temporarily opened to traffic on January 21.

Le Quang Dao Street before temporary opening day photo 2

The Le Quang Dao extended road project has a length of 2.673km, designed speed of 60km/h. The total investment is nearly 750 billion VND, invested by the People's Committee of Nam Tu Liem district. Currently, the section from Thang Long Avenue to the end of the intersection with Dai Mo road (about 1.9km) has been completed according to the approved design documents.

Le Quang Dao Street before temporary opening day photo 3
The remaining section, about 0.7km long, from Dai Mo intersection to the end of Nam Tu Liem district, is under construction and has achieved 80% of the volume according to the approved design documents.
Le Quang Dao Street before temporary opening day photo 4

After missing the early completion date of December 2024, contractors have focused on human resources, machinery, and equipment, determined to complete the project by May 2025.

Le Quang Dao Street before temporary opening day photo 5

A bridge on the route.

Le Quang Dao Street before temporary opening day photo 6

The contractor focuses on human resources to complete the remaining items.

Le Quang Dao Street before temporary opening day photo 7

In addition to the above project, the project to build a route from To Huu Street to the extended 70th Street, with a section from the road to Louis City Urban Area (Km0+617) to the intersection with the road through Dai Mo Ward People's Committee (Km1+490), has also been completed according to the approved design documents. It is expected that from January 21, the above route will also be put into temporary use to reduce traffic congestion.

Le Quang Dao Street before temporary opening day photo 8
The remaining sections have not been completed due to problems with site clearance, with construction volume reaching 75% of the approved design documents.
Le Quang Dao Street before temporary opening day photo 9
According to the People's Committee of Nam Tu Liem District, the temporary operation of the two routes will reduce congestion on main roads such as Thang Long Boulevard, Road 70, To Huu, Le Quang Dao and meet the travel needs of people during the Lunar New Year 2025.

Thanh Hieu - Phung Linh



Source: https://tienphong.vn/duong-le-quang-dao-truoc-ngay-thong-tuyen-tam-thoi-post1710905.tpo

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product