Vietnam.vn - Nền tảng quảng bá Việt Nam

Nam Dinh puts into operation provincial road 485B project on Tet holiday

Báo Giao thôngBáo Giao thông09/02/2024


The Department of Transport of Nam Dinh province said that the unit has received the handover of the section from Km5+745.49 to Km15+232.51 of the project to build provincial road 485B (from the left dike of Dao river to national highway 21B) through Vu Ban and My Loc districts to put into operation and use to serve the travel needs of the people, especially during the Lunar New Year and the Spring Festival in early 2024.

Nam Định đưa vào khai thác dự án tỉnh lộ 485B dịp Tết- Ảnh 1.

Nam Dinh put provincial road 485B into operation on the occasion of Lunar New Year 2024.

Therefore, to strengthen the work of ensuring traffic safety and order on the newly put into operation sections, the Department of Transport requests the People's Committees of My Loc and Vu Ban districts to direct departments, offices, functional forces and People's Committees of communes and towns where the route passes through to provide information on the local media system about putting the section from Km5+745.49 to Km15+232.51 into operation so that people know and choose appropriate travel routes.

Strengthen the propaganda and dissemination of traffic safety laws; provide guidance on safe traffic participation skills so that local people understand and comply; organize a review of the signaling system and speed bumps at level crossings and branch roads intersecting this route to have additional solutions and warnings to ensure traffic safety.

Propose that the Provincial Construction Investment Project Management Board direct the construction contractor and related units to fully perform the responsibility of construction warranty according to the provisions of law; Arrange permanent staff to handle situations arising when putting the route into operation to ensure safe and smooth traffic...

At the same time, the Department of Transport requested the Nam Dinh Traffic Infrastructure Maintenance Management Board to arrange staff to perform patrol and management tasks for the newly exploited route, coordinate with local authorities and functional forces to implement measures to ensure traffic safety and order on the route.

Assign the Department Inspectorate and the Traffic Infrastructure Management Department to proactively advise and implement measures to handle violations of infrastructure, road traffic safety corridors, etc. according to their authority to ensure traffic safety and order on newly put into use routes.



Source

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product