Vietnam.vn - Nền tảng quảng bá Việt Nam

National Highway 14C through Dak Nong province is seriously degraded.

Báo Kinh tế và Đô thịBáo Kinh tế và Đô thị06/01/2025


On January 4, 2025, Kinh te & Do thi reporters recorded dozens of degraded points from km308 to km321 of National Highway 14C passing through Dak Mil district ( Dak Nong province).

The road surface of National Highway 14C through Dak Mil district, Dak Nong province has many degraded spots from km308 to km321.
The road surface of National Highway 14C through Dak Mil district, Dak Nong province has many degraded spots from km308 to km321.
Cars have difficulty moving through this section of road.
Cars have difficulty moving through this section of road.
From km308 to km321, the road is severely damaged, so at night or when it rains, it is dangerous for people and vehicles.
From km308 to km321, the road is severely damaged, so at night or when it rains, it is dangerous for people and vehicles.
Slippery road surfaces are dangerous for vehicles when it rains.
Slippery road surfaces are dangerous for vehicles when it rains.
The road surface is very bad.
The road surface is very bad.
From km308 to km317, an average of 1.3 billion VND has been invested in each km for repairs, however, according to the overall record, the quality of the road has not improved much, the road surface still has many degraded spots.
From km308 to km317, an average of 1.3 billion VND has been invested in each km for repairs, however, according to the overall record, the quality of the road has not improved much, the road surface still has many degraded spots.
One of many blistering spots on National Highway 14C through Dak Mil district, Dak Nong province.
One of many blistering spots on National Highway 14C through Dak Mil district, Dak Nong province.

Risk of wasting budget

National Highway 14C is 566km long, running through the provinces of Kon Tum , Gia Lai, Dak Lak, Dak Nong and Binh Phuoc and is considered an important national highway, in addition to serving the socio-economic development goals of the localities, it also ensures security and national defense in the region.

In recent years, hundreds of billions of dong have been allocated annually for maintenance and repair along National Highway 14C, through publicly bid packages by local authorities. The section through Dak Nong province alone has tens of billions of dong in funding each year.

Specifically, in 2024, Dak Nong received an investment of 56 billion VND, of which more than 12 billion VND was invested in the section from km308 to km317 (9km long) through Dak Mil district for repair. The project was just completed and handed over at the end of 2024. However, looking at the overall short road with billions of VND invested, it is still like "a shirt full of patches and adjacent, intertwined holes".

This shows that National Highway 14C through Dak Nong - although the annual maintenance and repair costs are quite large, the efficiency is not high.



Source: https://kinhtedothi.vn/quoc-lo-14c-qua-tinh-dak-nong-xuong-cap-nghiem-trong.html

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product