Vietnam.vn - Nền tảng quảng bá Việt Nam

Agree on the overall adjustment plan for the Tuyen Quang - Ha Giang Expressway Project (phase 1)

Việt NamViệt Nam23/10/2024


The Tuyen Quang - Ha Giang Expressway project (phase 1) through Bach Xa commune (Ham Yen) is being accelerated by the contractor.

Tuyen Quang - Ha Giang Expressway Project (phase 1) has completed investment of 77km, scale of 4 lanes, design speed of 100km/h, according to expressway standards TCVN 5729-2012; 4-lane road surface for motor vehicles 4x3.75m; median strip 0.75m; inner safety strip 2x1.0m; emergency lane 2x3.0m; shoulder 2x0.75m. In which, investment is divided into 2 phases.

Phase 1 to 2025: The Provincial People's Committee agreed to invest in the construction of a new section of the first route, about 7.8 km long, including: Site clearance according to the completed scale of 25.25m; investment in a 2-lane expressway with a cross-section of Bn=12m; design of 5 overpasses with a scale of 12m, 11 underpasses, and 4.18 km of residential roads. Invest in the entire route in phase 1 (69.7km); adjust some items in phase 1 to ensure effective, safe, economical investment, and avoid waste when implementing phase 2 investment. Ensure the opening time in 2025 in accordance with the direction of the Prime Minister .

Phase 2 from 2026-2030 (phase 2) complete investment in the remaining items of the project, ensuring the scale of 4 complete lanes.

The Provincial People's Committee will complete the procedures to submit to the Ministry of Transport and the Ministry of Planning and Investment.



Source: https://baotuyenquang.com.vn/thong-nhat-phuong-an-dieu-chinh-tong-the-du-an-cao-toc-tuyen-quang-ha-giang-giai-doan-1!-200688.html

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product