Vietnam.vn - Nền tảng quảng bá Việt Nam

Temporary opening of 2 sections of Ben Luc highway

Báo Đầu tưBáo Đầu tư30/01/2025

The opening of two sections of the Ben Luc – Long Thanh expressway will create new directions to help reduce traffic congestion during the Lunar New Year holiday.


The opening of two sections of the Ben Luc – Long Thanh expressway will create new directions to help reduce traffic congestion during the Lunar New Year holiday.

On January 23 (December 24), Vietnam Expressway Corporation (VEC) temporarily put into operation two sections of Ben Luc - Long Thanh expressway, including: the section from Trung Luong intersection to National Highway 1A intersection and the section from Phuoc An intersection to National Highway 51 intersection.

Ben Luc - Long Thanh Expressway section passing through Dong Nai province - Photo: VEC

During the temporary exploitation period, trucks over 10 tons; specialized motorbikes with a design speed of less than 70 km/h; motorbikes, two-wheeled motorbikes; tractors, three-wheeled motorbikes, and motorbikes (including electric motorbikes) are not allowed to travel on the highway.

For vehicles eligible to travel on the expressway, the maximum speed allowed on the main route from Ben Luc to Ho Chi Minh City is 60 km/h. Within the intersection, it is 40 km/h. For access roads and other branches, it is 50 km/h. The safe distance between vehicles must be greater than 35 m for a speed of 60 km/h.

The section through Dong Nai allows the operating speed on the main route to be 100 km/h, the minimum speed is 60 km/h. Within the intersection, it is not more than 40 km/h. For access roads and other branches, it is not more than 50 km/h.

The safe distance between vehicles is greater than 70 m for a speed of 100 km/h.

VEC said that during the temporary exploitation phase, road usage fees will not be collected.

The temporary operation of two sections of the Ben Luc - Long Thanh expressway has promptly served the increased travel needs of people during the 2025 Lunar New Year.

In particular, these two expressway sections create new directions, helping people avoid traffic jams on National Highway 1 through Long An and National Highway 51 through Dong Nai province.

Currently, VEC and contractors are speeding up construction progress of the remaining sections to put the entire project into operation this year.



Source: https://baodautu.vn/thong-xe-tam-2-doan-cao-toc-ben-luc---long-thanh-d242397.html

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product