Vietnam.vn - Nền tảng quảng bá Việt Nam

Salvaging and detonating a bomb near the riverbank in Ha Tinh

Báo Tiền PhongBáo Tiền Phong10/10/2024


TPO - An American-made bomb weighing about 250-300kg was discovered on the edge of the Ngan Mo River in Ha Tinh and was safely salvaged and detonated by authorities.

Close-up of the bomb detonation discovered during the construction of a landslide embankment. Video : Pham Truong

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 1

On October 9, the Cam Xuyen District Military Command (Ha Tinh) coordinated with the Engineering Department (Ha Tinh Provincial Military Command) to deploy a plan to salvage a bomb discovered on the edge of the Ngan Mo River (Cam Due Commune, Cam Xuyen District).

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 2

Two days ago (October 7), a group of workers working on a project to repair landslides on the left bank of the Ngan Mo River discovered a bomb 2-3 meters underground, next to the riverbank, so they reported it to local authorities.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 3

After inspection, authorities recovered the bomb.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 4

Initial inspection determined that this bomb was a remnant of the war, a 500-LB GP MK3 MOD1 bomb manufactured in the US.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 5

The bomb is still quite intact, weighing about 250-300kg, about 1.5m long, and nearly 50cm wide.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 6

Authorities checked the bomb before taking it to the disposal site.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 7

The bomb was moved to the training ground of Thach Ngoc commune (Thach Ha district) for safe detonation.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 8

Engineers prepare to detonate the bomb.

Salvaging and detonating a bomb near the riverbank in Ha Tinh, photo 9

The project to repair the landslide embankment on the left bank of Ngan Mo River (Cam Due Commune, Cam Xuyen District, Ha Tinh) has a total investment of more than 14 billion VND, aiming to ensure the safety of people and civil infrastructure before the rainy and stormy season. The project is about 400m long, the embankment is 4.5 - 5m high, built of concrete and steel. The project started construction last August and is expected to be completed by the end of the year.

Half-ton bomb discovered during riverbank embankment construction
Half-ton bomb discovered during riverbank embankment construction

Arrested suspect who threw 'petrol bombs' at 3 banks in Phu Yen
Arrested suspect who threw 'petrol bombs' at 3 banks in Phu Yen

Day and night building embankments to overcome riverbank erosion in Ha Tinh
Day and night building embankments to overcome riverbank erosion in Ha Tinh

Pham Truong



Source: https://tienphong.vn/truc-vot-huy-no-qua-bom-canh-mep-song-o-ha-tinh-post1680835.tpo

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product