Vietnam.vn - Nền tảng quảng bá Việt Nam

Traffic jam on the Ho Chi Minh City - Long Thanh highway

Báo Tiền PhongBáo Tiền Phong28/09/2024


On the 1.5 km stretch of road across Muong Kenh bridge on the Ho Chi Minh City - Long Thanh - Dau Giay expressway, vehicles have to move little by little.

At around 10am this morning, September 28, the number of vehicles on the Ho Chi Minh City - Long Thanh - Dau Giay expressway increased dramatically, leading to congestion.

Traffic jam on the Ho Chi Minh City - Long Thanh - Dau Giay expressway photo 1

Traffic jams, one after another on the Ho Chi Minh City - Long Thanh - Dau Giay expressway - Photo: Truong Hoang

On the 1.5 km stretch of road across Muong Kenh bridge, vehicles had to move little by little.

As observed, a long line of cars was seen on the Ho Chi Minh City - Long Thanh - Dau Giay highway. The heat from the engines of the vehicles was sweltering.

Traffic jam on the highway ramp. Clip: Truong Hoang

Mr. Vo Duc Dung said he was taking his family on a weekend vacation in Phan Thiet. Although the family tried to leave early, they still could not avoid the traffic jam on the weekend.

"Over the weekend, I took my wife and children on a beach vacation. Even though I left early, I didn't expect that there would be a long traffic jam just entering the highway," said Mr. Dung, disappointed.

Recently, the Ho Chi Minh City People's Committee has submitted a document to the City People's Council on the investment policy for the project to expand the Ho Chi Minh City - Long Thanh - Dau Giay expressway (from An Phu intersection to Ring Road 2), from 4 lanes to 8 lanes.

According to the Ho Chi Minh City People's Committee, the section from An Phu intersection to Ring Road 2 is part of the Ho Chi Minh City - Long Thanh - Dau Giay Expressway, which serves as the main connecting route between the North - South Expressway and Ho Chi Minh City. However, in recent times, both the Ho Chi Minh City - Long Thanh - Dau Giay Expressway and the access road have always been overloaded with vehicles and frequently congested.

The State Capital Management Committee at Enterprises has proposed that the Government assign VEC to invest in expanding the 22km Ho Chi Minh City - Long Thanh expressway section with a scale of 8-10 lanes.

The total estimated investment is about 14,955 billion VND. If the procedures are favorable, the Ho Chi Minh City - Long Thanh section expansion project will complete investment preparation before February 2025 so that it can be implemented from March 2025 to December 2027.

According to Lao Dong



Source: https://tienphong.vn/xe-ket-cung-tren-duong-dan-cao-toc-tphcm-long-thanh-dau-giay-post1677322.tpo

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product