Vietnam.vn - Nền tảng quảng bá Việt Nam

Officially operating 110 kV Hong Linh transformer station

Việt NamViệt Nam19/11/2023

Putting the 110 KV Hong Linh transformer station (Ha Tinh) into operation ensures electricity supply for Hong Linh town and neighboring areas, contributing to promoting economic development in the area.

For a long time, the power grid in Hong Linh town has been supplied from 3 110 kV transformer stations (Can Loc, Linh Cam and Nghi Xuan). To proactively supply power and ensure the load for industrial and residential development in Hong Linh town and part of Can Loc and Duc Tho districts, the electricity sector has invested in building the 110 kV Hong Linh transformer station.

Officially operating 110 kV Hong Linh transformer station

Ha Tinh Electricity Company has just energized two 35kV feeders, lines 375 and 377, after the Hong Linh 110kV substation, officially putting the Hong Linh substation into operation.

After the 110kV Hong Linh substation was completed in January 2023, the project to build two 35kV feeders, lines 375 and 377 after the 110kV Hong Linh substation (total investment of 8.5 billion VND) was also implemented.

The project scale includes 2 35kV feeders with a total length of about 3.5km. Of which, feeder 375 has 0.69km of underground cable and 0.93km of overhead cable; feeder 377 has 1.1km of underground cable and 0.8km of overhead cable.

After the construction process, the project has been completed and energized, officially putting the 110 KV Hong Linh substation into operation.

Officially operating 110 kV Hong Linh transformer station

The development of industrial zones and clusters in Hong Linh town means an increase in electricity load.

Ha Tinh is supplied with electricity from two main sources: the 500kV Ha Tinh station and the 220kV Hung Dong station ( Nghe An ) through 12 110kV transformer stations with a total capacity of 599 MVA. In addition, it is also supported by four hydropower plants (Ho Ho, Ke Go, Huong Son and Ngan Truoi) with a total capacity of 75.5 MW; two power sources from the Cam Hoa and Cam Hung solar power plants (Cam Xuyen) with a total capacity of nearly 80 MW and 480 customers installing rooftop solar power with a total capacity of 140 MWp.

Thao Hien


Source

Comment (0)

No data
No data
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together

Heritage

Figure

Business

No videos available

News

Political System

Local

Product