Vietnam.vn - Nền tảng quảng bá Việt Nam

Adjusting the planning for renovation and construction of new housing areas serving land acquisition and clearance in Long Bien

Báo Kinh tế và Đô thịBáo Kinh tế và Đô thị12/09/2024


According to the Decision, the land plot marked CT2 is located in Long Bien ward, Long Bien district; the North borders Co Linh street, the West borders the existing street, the remaining sides border the land plot with green space function. The scale of the study to establish local adjustments to the detailed planning has an area of about 13,953 m2.

The adjustment objective is to concretize the Master Plan for the Capital Construction to 2030 with a vision to 2050; the N10 urban subdivision plan at a scale of 1/2,000 approved by competent authorities; exploit and effectively use land funds, improve utilities, improve apartment quality, improve living conditions, increase investment efficiency, contribute to increasing supply for the real estate market; serve as a legal basis for establishing construction investment projects according to approved plans and as a basis for management agencies and local authorities to manage construction according to the provisions of law.

Accordingly, the total floor area will be adjusted to increase (The proposed basement construction area is 8,293m2, including 3,340m2 of the 9,000m2 planned land area for gardens, trees, walking paths, a part below is the basement (in addition to the auctioned area), land use coefficient, basement boundary; adding 01 basement. The scale and function of specific items in the project will be specified in the basic design phase, investment project implementation, ensuring compliance with the planning criteria identified in the project, complying with national technical regulations and other relevant current legal regulations.

The City People's Committee assigned the Department of Planning and Architecture to confirm the documents and drawings for Local Adjustment of the Detailed Planning at a scale of 1/500 for Renovation and new construction of the Housing Area serving the project of site clearance and preliminary leveling of the land for auction of land use rights in Long Bien ward at the land plot coded CT2.

Long Bien District People's Committee presides, coordinates and organizes the public announcement of local adjustments to the approved detailed planning so that relevant organizations, agencies and people can know and implement.

Long Bien District People's Committee, Long Bien Ward People's Committee and the Department of Construction Inspectorate are responsible for inspecting and supervising construction according to approved planning, handling cases of construction in violation of planning according to their authority and regulations of law.



Source: https://kinhtedothi.vn/dieu-chinh-quy-hoach-cai-tao-xay-moi-khu-nha-phuc-vu-gpmb-o-long-bien.html

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product