Vietnam.vn - Nền tảng quảng bá Việt Nam

Hai Duong regulates water for winter-spring crop production 2024-2025 in 4 phases

Việt NamViệt Nam10/11/2024


car-bridge.jpg
Cau Xe culvert (Tu Ky) has the task of regulating water in the downstream area of the Bac Hung Hai irrigation system (documentary photo)

From now until December 25, the Bac Hung Hai irrigation system is expected to carry out 3 water withdrawals (each lasting 5 days) to facilitate plowing, repairing, dredging sluice gates and channels. After that, water will be regulated to serve winter crop irrigation, spring rice seedling irrigation and improve the water environment.

After December 26, the system will be buffered and stored with maximum water. Based on the actual situation, Bac Hung Hai Irrigation Works Exploitation One Member Co., Ltd. will consider operating Xuan Quan pumping station to supplement water for flooding when the water level of the external rivers is low or salty.

The concentrated flooding phase is expected to take water in 2 phases (phase 1 from January 13-16, 2025, phase 2 from February 8-15, 2025). The Company will maintain the highest water level according to the supply capacity of water sources from hydroelectric reservoirs so that localities can concentrate on taking water. Water regulation is expected to be carried out in rotation to ensure the distribution of flooding for the entire system. Strive to complete the flooding before February 10, 2025.

During the irrigation phase, the company will store water during high water and high tide periods to irrigate during low water and low tide periods. The plan to operate Xuan Quan pumping station to supplement water sources in case of low water sources has also been taken into account.

Before December 26, Bac Hung Hai Irrigation Works Exploitation One Member Co., Ltd. will complete the construction repair, dredging the Xuan Quan outer canal gate, and clearing congestion on the main routes...

The company recommends that localities proactively take water and retain water as required for irrigation. Proactively dam the canal head sluices to repair and dredge the canal leading to the suction pit and complete the repair and dredging before 7:00 a.m. on December 26.

TM


Source: https://baohaiduong.vn/hai-duong-dieu-tiet-nuoc-phuc-vu-san-xuat-vu-dong-xuan-2024-2025-theo-4-giai-doan-397686.html

Comment (0)

No data
No data
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together

Heritage

Figure

Business

No videos available

News

Political System

Local

Product