Vietnam.vn - Nền tảng quảng bá Việt Nam

Hoa Binh, Son La and Tuyen Quang hydroelectric reservoirs simultaneously discharge floodwaters

Báo Kinh tế và Đô thịBáo Kinh tế và Đô thị02/08/2024


Hoa Binh Hydroelectric Reservoir is operating to discharge floodwaters.
Hoa Binh Hydroelectric Reservoir is operating to discharge floodwaters.

At 8:00 a.m. on August 2, 2024, the upstream water level of Son La Lake was at elevation 203.45m; inflow to the lake was 9,220m3/s, discharge was 2,936m3/s. The upstream water level of Hoa Binh Lake was at elevation 102.15m; inflow to the lake was 3,355m3/s, discharge was 3,855m3/s. The upstream water level of Tuyen Quang Lake was at elevation 109.73m; inflow to the lake was 2,331m3/s, discharge was 670m3/s.

Implementing the inter-reservoir operation process on the Red River basin in Decision No. 740/QD-TTg of the Prime Minister, on the morning of August 2, the Ministry of Agriculture and Rural Development issued an official dispatch, ordering the Director of Son La Hydropower Company, the Director of Hoa Binh Hydropower Company and the Director of Tuyen Quang Hydropower Company to carry out the regulation operation.

Specifically, the Ministry of Agriculture and Rural Development requested the Director of Son La Hydropower Company to open one bottom spillway gate of Son La reservoir at 12:00 on August 2, 2024 and open the second bottom spillway gate at 14:00 on August 2, 2024.

The Ministry of Agriculture and Rural Development also ordered the opening of the second bottom spillway gate of Hoa Binh Hydropower Reservoir at 6:00 p.m. on August 2, 2024; at the same time, opening a bottom spillway gate of Tuyen Quang Hydropower Reservoir at 12:00 p.m. on August 2, 2024.

To ensure safety for construction works and riverside activities, the same morning, the Ministry of Agriculture and Rural Development sent an official dispatch to 14 provinces and cities in the Red River - Thai Binh system (including Hanoi), requesting that organizations immediately notify authorities at all levels, people, and organizations operating on rivers and along rivers to proactively take preventive measures to ensure safety for people and property.

At the same time, localities directed relevant agencies and units to coordinate with the reservoir owner to find solutions to ensure safety for curious people approaching the flood discharge area. At the same time, regularly report on the flood situation and reservoir operations to the Ministry of Agriculture and Rural Development to have timely management plans, ensuring absolute safety for the reservoirs, dams and downstream areas.



Source: https://kinhtedothi.vn/ho-chua-thuy-dien-hoa-binh-son-la-tuyen-quang-dong-loat-xa-lu.html

Comment (0)

No data
No data
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together

Heritage

Figure

Business

No videos available

News

Political System

Local

Product