Vietnam.vn - Nền tảng quảng bá Việt Nam

Leaders of the Department of Roads direct the repair of landslides on National Highway 2 in Ha Giang

Báo Giao thôngBáo Giao thông30/09/2024


At about 9:30 a.m. on September 29, the slope of the positive slope section from Km 240+300 to Km 240+600 of National Highway 2 in Bac Quang district, Ha Giang province, suffered a serious landslide.

Lãnh đạo Cục Đường bộ chỉ đạo khắc phục sạt lở trên QL2 ở Hà Giang- Ảnh 1.

Scene of the landslide.

The estimated volume of landslides is more than 30,000m3, causing traffic congestion on National Highway 2; the landslides buried some houses and damaged some vehicles.

One person has died because his house was buried by rocks and soil, and two passersby were buried by landslides and are missing.

Leaders of the Vietnam Road Administration immediately went to the scene to urge and inspect road units to coordinate with localities in search and rescue, and overcoming the consequences of natural disasters.

Present at the scene, the leaders of the Road Department and Road Management Area I directed the contractor managing the route to mobilize 4 excavators to the scene to search for victims and promptly clear the landslide and rocks on the route to temporarily open the road. In addition, they directed the subordinate units to carry out search and rescue work and overcome the consequences of natural disasters; at the same time, they directed the checkpoints to be on duty 24/24h, regulating and ensuring traffic.

However, because the two victims were still buried in the landslide, the excavation and clearing work at the scene has not been able to be carried out in large quantities; on the other hand, last night (September 29 to 30), heavy rain continued to fall in Bac Quang district, Ha Giang, so the search and rescue forces and disaster relief forces had to temporarily stop working at night.

Ha Giang Department of Transport has coordinated with Highway QLDB I to organize traffic diversion through other routes to bypass the landslide area.

Lãnh đạo Cục Đường bộ chỉ đạo khắc phục sạt lở trên QL2 ở Hà Giang- Ảnh 2.

Mr. Nguyen Van Son - Chairman of Ha Giang Provincial People's Committee was present at the scene.

Mr. Nguyen Xuan Anh - Deputy Director of the Vietnam Road Administration said that he has assigned Road Management Area I to direct Company 232 (the unit performing regular maintenance work on the route) to mobilize maximum human resources and construction equipment.

The unit needs to urgently carry out the work of clearing the 2 ends of the route, ensuring initial traffic, expected to open to traffic on October 1, 2024.

"During the construction process, the construction unit always has a team on duty to warn and ensure safety before construction can begin. Coordinate with the police and military to warn of landslides and ensure safe construction," Mr. Anh requested.



Source: https://www.baogiaothong.vn/lanh-dao-cuc-duong-bo-xuong-hien-truong-chi-dao-khac-phuc-sat-lo-tren-ql2-o-ha-giang-192240930124726249.htm

Comment (0)

No data
No data
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together

Heritage

Figure

Business

No videos available

News

Political System

Local

Product