Vietnam.vn - Nền tảng quảng bá Việt Nam

Efforts to ensure traffic after storms

Báo Giao thôngBáo Giao thông20/12/2024

Despite many efforts, for more than 3 months now, storm number 3 (Yagi) has left serious consequences in Cao Bang .


According to information from Cao Bang Road Joint Stock Company, due to the impact of storm No. 3, National Highway 34, the section passing through Cao Bang province, has suffered serious landslides with 359 positive slope landslides, with an estimated volume of about 123,000m3; 54 negative slope landslides and more than 29 damaged road surface locations.

During the time before, during and after the storm, hundreds of officers, engineers and traffic workers of Cao Bang Road Management Joint Stock Company did not mind the difficulties and were ready to face the dangers to clear the roads and ensure smooth traffic on the routes.

Cao Bằng: Nỗ lực bảo đảm lưu thông sau mưa bão- Ảnh 1.

Cao Bang Road Management Joint Stock Company mobilized vehicles and machinery to repair road surfaces on several traffic routes after the impact of storm No. 3.

Since the beginning of the rainy season, the unit has mobilized more than 20 excavators and nearly 30 trucks to operate continuously and non-stop to clear the route and clear landslides on National Highway 34.

After many efforts, the road management unit has now completed the work of clearing the road to ensure traffic on Highway 34, ensuring people's travel.

Up to now, landslides and traffic jams have been thoroughly handled, however, many sections of road surface through Nguyen Binh, Bao Lac, and Bao Lam districts are still peeling and cracking, the positive and negative slopes are continuously eroding... along with a series of rough subsidence causing obstacles and potential traffic safety risks.

To completely restore the traffic system on the route, Cao Bang Department of Transport is coordinating with relevant agencies to develop a plan to request the Ministry of Transport to issue a construction order, as a basis for repairing and restoring traffic for damaged locations of a complex nature.



Source: https://www.baogiaothong.vn/cao-bang-no-luc-bao-dam-luu-thong-sau-mua-bao-192241220105108052.htm

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product