Vietnam.vn - Nền tảng quảng bá Việt Nam

New ferry expected to reduce congestion in Cat Ba

Báo Dân tríBáo Dân trí30/06/2024


Phà mới với kỳ vọng giảm ùn tắc ở Cát Bà - 1

According to the reporter's records, 1 of 5 newly built ferries added to Dong Bai ferry terminal to serve the transportation of passengers, vehicles of tourists and people to Cat Ba island and vice versa, has docked.

Phà mới với kỳ vọng giảm ùn tắc ở Cát Bà - 2

The first ferry to dock at Dong Bai ferry terminal was numbered HP 6139 with the name Cat Ba 03, 58m long and 15m wide.

According to design, the new ferry has a load capacity of nearly 200 tons, can carry 500 passengers, 9 47-seat cars, 40 motorbikes... and is expected to help reduce traffic congestion on the journey to Cat Ba Island.

The ferry roof area is where passengers can stand and admire the sea and island scenery.

Phà mới với kỳ vọng giảm ùn tắc ở Cát Bà - 3

The main cabin of the ferry.

Phà mới với kỳ vọng giảm ùn tắc ở Cát Bà - 4

The new ferry blade is designed by the manufacturer to go up and down depending on the terrain of the pier, which ensures safer boarding and disembarkation of vehicles.

Phà mới với kỳ vọng giảm ùn tắc ở Cát Bà - 5

Passenger seating compartment on ferry.

The new ferry is still completing related procedures before being handed over and put into operation.

Phà mới với kỳ vọng giảm ùn tắc ở Cát Bà - 6

Dong Bai ferry terminal (Cat Hai district) officially came into operation on March 1, replacing Got ferry terminal 4km away, continuing its mission of transporting people, tourists and vehicles from the mainland through Lach Huyen to Cat Ba island and vice versa.

However, as soon as it came into operation, the new ferry terminal revealed some shortcomings due to incomplete infrastructure, especially the old ferries were no longer suitable for the new, modern ferry terminal...

Recently, during peak tourist days, there have been prolonged local traffic jams at the ferry terminal. Five new ferries with a total investment of about 130 billion VND are expected to solve this traffic jam problem.



Source: https://dantri.com.vn/xa-hoi/pha-moi-voi-ky-vong-giam-un-tac-o-cat-ba-20240629174706485.htm

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product