Vietnam.vn - Nền tảng quảng bá Việt Nam

IC 13 intersection connecting Yen Bai city with Noi Bai highway opens to traffic

Báo Giao thôngBáo Giao thông25/01/2025

The IC13 interchange project (section Km 122+800) of Noi Bai - Lao Cai expressway, with a total investment of more than 362 billion VND, officially came into operation at 5:00 p.m. this afternoon (January 25).


A representative of the Yen Bai Traffic Construction Investment Project Management Board said that from 5:00 p.m. on January 25 (ie the 26th of the Lunar New Year), IC 13 will be put into operation to serve the travel needs of the people.

Thông xe nút giao IC 13 nối TP Yên Bái với cao tốc Nội Bài - Lào Cai- Ảnh 4.
Thông xe nút giao IC 13 nối TP Yên Bái với cao tốc Nội Bài - Lào Cai- Ảnh 5.

Overview of IC 13 intersection officially put into operation at 5:00 p.m. on January 25.

IC13 Interchange Project of Noi Bai - Lao Cai Expressway (section Km 122 + 240), located in Au Lau Commune, Yen Bai City. The project was approved and adjusted by the Chairman of Yen Bai Provincial People's Committee on August 19, 2021 and October 7, 2022 with a total investment of 362 billion VND.

The project started construction in March 2023, constructed by a joint venture of Hanoi D&T Construction Investment Consulting Joint Stock Company - 307 Quang Phu Joint Stock Company - Elcom Telecommunication Technology Joint Stock Company.

After being put into operation, the intersection is expected to make travel from the provinces of Lao Cai, Phu Tho, Vinh Phuc to some localities of Yen Bai such as Tran Yen, Yen Bai city and western districts and towns such as Van Chan, Nghia Lo, Tram Tau, Mu Cang Chai more convenient.

According to the design, the project consists of 2 main items. The IC13 intersection includes the main branch road system (branch A) and 4 branches (B, C, D, E) connecting branch A with Noi Bai - Lao Cai highway at Km 122 + 240.

Branch A is 0.5 km long, roadbed width 23.5 m; branches B, C, D, E have a total length of 1.5 km, roadbed width 8 m.

The system, lighting, road signs, and traffic safety guardrails have been fully installed. This is the third intersection from Noi Bai - Lao Cai Expressway into Yen Bai province.



Source: https://www.baogiaothong.vn/thong-xe-nut-giao-ic-13-noi-tp-yen-bai-voi-cao-toc-noi-bai-lao-cai-192250125122323035.htm

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product