Vietnam.vn - Nền tảng quảng bá Việt Nam

Cam Lam - Vinh Hao Expressway: Full route fee from 130,000

Báo Thanh niênBáo Thanh niên23/05/2024


On May 23, a representative of Deo Ca Group, the joint investor of the Cam Lam - Vinh Hao expressway, said that from 0:00 on May 28, the Cam Lam - Vinh Hao expressway will officially collect service fees with the entire route (78.5 km) costing from 130,000 - 497,000 VND/trip.

Từ 0 giờ ngày 28.5, cao tốc Cam Lâm - Vĩnh Hảo chính thức thu phí

From 0:00 on May 28, Cam Lam - Vinh Hao expressway officially collects tolls

Specifically: Vehicles with less than 12 seats, trucks with a load capacity of less than 2 tons; all types of public passenger buses, the service fee for the entire route is 130,000 VND/trip. Vehicles with 12 to 30 seats; trucks with a load capacity of 2 tons to less than 4 tons: 170,000 VND/trip. Vehicles with 31 seats or more; trucks with a load capacity of 4 tons to less than 10 tons: 222,000 VND/trip. Trucks with a load capacity of 10 tons to less than 18 tons; trucks carrying goods in 20-foot containers: 353,000 VND/trip. Trucks with a load capacity of 18 tons or more; trucks carrying goods in 40-foot containers: 497,000 VND/trip.

Cao tốc Cam Lâm - Vĩnh Hảo có tổng chiều dài 78,5 km, đi qua 3 tỉnh Khánh Hòa, Ninh Thuận và Bình Thuận

Cam Lam - Vinh Hao Expressway has a total length of 78.5 km, passing through 3 provinces: Khanh Hoa, Ninh Thuan and Binh Thuan.

The North-South Expressway construction project in the East phase 2017-2020, Cam Lam - Vinh Hao section has a total investment of 8,925 billion VND, length of 78.5 km, passing through 3 provinces of Khanh Hoa, Ninh Thuan and Binh Thuan .

On the route, there is a 2.2 km long Nui Vung tunnel, with a scale of 3 lanes, a tunnel width of 14m, phase 1 using the right tunnel, 2-way traffic invested by a consortium of Deo Ca Group Joint Stock Company, Deo Ca Construction Joint Stock Company and 194 Construction Investment Joint Stock Company, put into operation, operating without toll collection from April 26.

In addition, the project investor has proactively spent money to build temporary rest stops along the route to serve people for free while waiting for the Ministry of Transport to approve the investment in building official rest stops.



Source: https://thanhnien.vn/cao-toc-cam-lam-vinh-hao-phi-toan-tuyen-muc-tu-130000-497000-dong-luot-185240523173034688.htm

Comment (0)

No data
No data
Wild beauty on Ha Lang grass hill - Cao Bang
Vietnam Air Force practices preparing for A80
Missiles and combat vehicles 'Made in Vietnam' show off their power at A80 joint training session
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product