Vietnam.vn - Nền tảng quảng bá Việt Nam

Dien Chau - Bai Vot Expressway starts collecting tolls from January 5, 2025

Người Lao ĐộngNgười Lao Động02/01/2025

(NLDO) - The Dien Chau - Bai Vot expressway through Nghe An and Ha Tinh provinces will officially collect tolls to recover investment capital from January 5.


On January 2, Phuc Thanh Hung Investment Joint Stock Company announced the implementation of toll collection to recover capital for the Dien Chau ( Nghe An ) - Bai Vot (Ha Tinh) Expressway Component Project under the BOT form.

According to this announcement, on December 27, 2024, the State Inspection Council for Construction Acceptance agreed to accept the investor's conditional acceptance results for the project.

From 0:00 on January 5, 2025, the project will officially collect tolls to recover investment capital according to the provisions of the BOT contract signed with the Ministry of Transport . The toll collection period is 16 years, 6 months, and 8 days.

Cao tốc Diễn Châu - Bãi Vọt bắt đầu thu phí từ ngày 5-1-2025- Ảnh 1.

A section of highway passing through Nghi Loc district, Nghe An

The project has 4 toll stations, of which 3 are located in Nghe An: Km430+500, Dien Cat commune, Dien Chau district; Nghi Phuong intersection, Nghi Phuong commune, Nghi Loc district; National Highway 46B intersection, Hung Tay commune, Hung Nguyen district and one station located at National Highway 8A intersection, Thanh Binh Thinh commune, Duc Tho district, Ha Tinh.

Toll stations all use non-stop electronic toll collection system for all lanes, applying radio wave object recognition technology, free multi-lane ETC input, single-lane ETC output.

Cao tốc Diễn Châu - Bãi Vọt bắt đầu thu phí từ ngày 5-1-2025- Ảnh 3.

Toll rates on Dien Chau - Bai Vot highway

All vehicles entering the expressway must use the non-stop electronic toll collection service. In case of intentional violation, service will be refused and the authorities will handle it according to the law. Vehicles will travel at a maximum speed of 90 km/h, minimum 60 km/h.

Dien Chau - Bai Vot Expressway has a total length of more than 50 km, passing through two provinces of Nghe An (44.4 km) and Ha Tinh (4.9 km), with a total investment of more than VND 11,000 billion. The project started construction in May 2021 and the first 30 km of the route (from the QL7A intersection to the QL46B intersection, in Nghe An province) was opened to traffic on April 30, 2024. The remaining 19 km (from the QL46B intersection to the QL8A intersection) was opened to traffic on June 30, 2024.



Source: https://nld.com.vn/cao-toc-dien-chau-bai-vot-bat-dau-thu-phi-tu-ngay-5-1-2025-196250102162314929.htm

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product