Vietnam.vn - Nền tảng quảng bá Việt Nam

Building 8 'bunkers' on Nguyen Trai Street

Báo Thanh niênBáo Thanh niên10/06/2023


Accordingly, the construction unit mobilized dozens of workers, materials and machinery to build a corrugated iron "bunker" on Nguyen Trai Street, from alley 495 Nguyen Trai to number 2 Nguyen Xien Street (Thanh Xuan District).

Hà Nội: Dựng 8 'lô cốt' trên đường Nguyễn Trãi - Ảnh 1.

Workers build a "bunker" near alley 495 Nguyen Trai

Speaking to the press, Mr. Chong Jiun Yiat, project manager of contractor Teken Corporation, said that 8 "bunkers" were built on a road about 500 meters long, with different sizes. Each "bunker" will be built here for about 6 months.

"To ensure smooth traffic flow for people through the project area, we will construct as we fence," added Mr. Chong Jiun Yiat.

According to the traffic diversion plan of the Hanoi Department of Transport, from now until December 8, the authorities will prohibit all vehicles from going straight or turning left at the Khuat Duy Tien - Nguyen Trai intersection in the direction of Khuat Duy Tien, Nga Tu So (Thanh Xuan District).

Instead, vehicles turning left onto Khuat Duy Tien Street will go in the direction of Thanh Xuan underpass, turn around at the opening of the median strip at ER12 - ER13 to continue turning right onto Khuat Duy Tien Street. Vehicles going to Nga Tu So will go through Thanh Xuan underpass to go to Nga Tu So.

For vehicles turning right to Nguyen Xien, turning back before the intersection to Nguyen Trai and entering Nguyen Trai street area (from alley 495 Nguyen Trai to number 2 Nguyen Xien street) are allowed to circulate.

The Yen Xa wastewater treatment system project has a total investment of more than 61 million yen (equivalent to more than 16,293 billion VND), using ODA capital from Japan and counterpart capital from Hanoi City. The project started on October 7, 2016, with the Hanoi City Management Board of Investment and Construction of Technical Infrastructure and Agriculture as the investor.

In November 2022, many construction wells of the Yen Xa wastewater treatment system project continuously set up "bunkers" on Nguyen Xien, Kim Giang, Luong The Vinh streets... occupying almost the entire roadway, causing serious congestion.

Hà Nội: Dựng 8 'lô cốt' trên đường Nguyễn Trãi - Ảnh 2.

Warning signs are fully installed before fence construction begins.

Hà Nội: Dựng 8 'lô cốt' trên đường Nguyễn Trãi - Ảnh 3.

8 "bunkers" will be built on a road about 500 m long.

Hà Nội: Dựng 8 'lô cốt' trên đường Nguyễn Trãi - Ảnh 4.

Workers work busily on the evening of June 9

Hà Nội: Dựng 8 'lô cốt' trên đường Nguyễn Trãi - Ảnh 5.

According to the traffic diversion plan of the Hanoi Department of Transport, from now until December 8, the authorities will prohibit all vehicles from going straight or turning left at the Khuat Duy Tien - Nguyen Trai intersection in the direction of Khuat Duy Tien and Nga Tu So.



Source link

Comment (0)

No data
No data
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together

Heritage

Figure

Business

No videos available

News

Political System

Local

Product