Vietnam.vn - Nền tảng quảng bá Việt Nam

Proposal to operate Nhon Metro

Báo Tiền PhongBáo Tiền Phong05/08/2024


TPO - The Hanoi Urban Railway Project Management Board (MRB) has just proposed to the Hanoi People's Committee to allow commercial operation of the elevated section of the Nhon - Hanoi Railway Station urban railway project from August 9.

MRB said the above proposal was made after the elevated section of the project from Nhon to Cau Giay was evaluated by the State Inspection Council (the final stage) and approved for commercial operation.

In order for the elevated section to be put into passenger operation, MRB proposed that the City People's Committee complete and put it into commercial operation on August 9.

Along with that, MRB proposed that the City People's Committee consider and assign tasks to relevant agencies and units. In particular, the Department of Transport directed the Department's Inspectorate to coordinate with the traffic police force and relevant units to unify the plan to organize traffic flow to ensure traffic safety.

The People's Committees of Bac Tu Liem, Nam Tu Liem, Cau Giay, Ba Dinh, and Dong Da districts organize environmental sanitation, do not let people dump garbage and waste materials on the sidewalks along both sides of the road, ensure traffic safety, security and order; deploy decoration items to celebrate the 70th anniversary of the Liberation of the Capital at the station area...

The Nhon - Hanoi Railway Station urban railway project is 12.5km long, of which the elevated section (Nhon - Cau Giay) is 8.5km long and the underground section (Cau Giay - Hanoi Station) is 4km long. When the elevated section is put into operation, each train will carry about 1,000 passengers, each hour the train can carry more than 8,000 passengers/way.

Nhon - Hanoi Railway Station Metro is granted international safety certification for operation.
Nhon - Hanoi Railway Station Metro is granted international safety certification for operation.

Nhon - Hanoi Railway Station urban railway line to be operational before July 28, 'definitely no delay'!
Nhon - Hanoi Railway Station urban railway line to be operational before July 28, 'definitely no delay'!

Nhon - Hanoi Railway Station to be tested for 7 weeks before official operation
Nhon - Hanoi Railway Station to be tested for 7 weeks before official operation

Mr. Trong



Source: https://tienphong.vn/de-xuat-van-hanh-metro-nhon-ga-ha-noi-tu-ngay-98-post1660339.tpo

Comment (0)

No data
No data
Wild beauty on Ha Lang grass hill - Cao Bang
Missiles and combat vehicles 'Made in Vietnam' show off their power at A80 joint training session
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product