Vietnam.vn - Nền tảng quảng bá Việt Nam

Red River Bridge connecting Thai Binh province closes

Việt NamViệt Nam15/09/2024


The Red River Bridge has a total length of 1,400m with 27 spans, including 5 main spans and the middle span across the river with a span of 120m.

Hợp long cầu vượt sông Hồng nối Thái Bình - Nam Định- Ảnh 1.

The Red River Bridge connecting Thai Binh - Nam Dinh officially closed.

The total investment of the project is nearly 1,000 billion VND. This is a bridge across the Red River connecting two districts, Tien Hai (Thai Binh) and Giao Thuy ( Nam Dinh ).

The closing of the Red River Bridge is an important milestone, the last bridge completed in the coastal road project of Thai Binh province and is considered the most important item on the entire route.

The project is of great significance, not only contributing to the completion of traffic infrastructure in the region, forming a main coastal traffic axis for socio -economic development, but also strengthening national defense, security, and responding to climate change; especially, it is of decisive significance for the development of Thai Binh Economic Zone.

Hợp long cầu vượt sông Hồng nối Thái Bình - Nam Định- Ảnh 2.

Workers poured the last concrete blocks to close the bridge.

After the coastal road project of Thai Binh province, which is part of the North-South coastal road planning, is completed and put into operation, with its strategic location, bordering potential economic regions such as Quang Ninh and Hai Phong to the North and Thanh Hoa and Nam Dinh to the South, Thai Binh will be able to fully exploit the benefits of trade when the coastal road is completed, becoming a bridge connecting coastal corridor traffic between provinces.

Travel time from Thai Binh to Ha Long (Quang Ninh) is now 90 minutes instead of 2.5 hours as before, to Van Don Airport is only 150 minutes and to Mong Cai Border Gate is 180 minutes.

Hợp long cầu vượt sông Hồng nối Thái Bình - Nam Định- Ảnh 3.

The Red River Bridge has a total length of 1,400m connecting Tien Hai district (Thai Binh) and Giao Thuy district (Nam Dinh).

Previously, to focus on overcoming the consequences caused by storm No. 3 and floods, Thai Binh province decided to stop organizing the event to close the bridge over the Red River connecting Thai Binh - Nam Dinh.

Source: https://www.baogiaothong.vn/hop-long-cau-vuot-song-hong-noi-thai-binh-nam-dinh-19224091510281754.htm


Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product