Vietnam.vn - Nền tảng quảng bá Việt Nam

Nui Thanh invests 3.7 billion VND to build residential drainage system

Việt NamViệt Nam16/04/2025


Project investment content includes: Concrete ditch system with length of 530m; diversion ditch section with 80cm centrifugal buy pipe from the end point of concrete ditch to the existing ditch, length of 240m; 20cm HDPE wastewater drainage pipe system located on the left sidewalk of route junction 13 to junction 1, length of 360m.

The investment capital for the project is from the district budget in the 5-year medium-term public investment plan (2021 - 2025). Upon completion, the project will resolve localized flooding in Tien Xuan residential area.



Source: https://baoquangnam.vn/nui-thanh-dau-tu-3-7-ty-dong-xay-dung-he-thong-thoat-nuoc-khu-dan-cu-3152848.html

Comment (0)

No data
No data
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together

Heritage

Figure

Business

No videos available

News

Political System

Local

Product