Vietnam.vn - Nền tảng quảng bá Việt Nam

National Highway 20 through Bao Loc City is jammed with vehicles due to culvert construction.

As of noon on June 28, the prolonged traffic congestion on National Highway 20 through Bao Loc City (Lam Dong Province) has shown no signs of abating due to the bridge replacement construction project.

Báo Sài Gòn Giải phóngBáo Sài Gòn Giải phóng28/06/2025

Video of traffic congestion on National Highway 20 through Bao Loc City

According to records, traffic on National Highway 20 through the territory of Dai Lao and Loc Chau communes (Bao Loc city) is limited to one-way traffic because units are repairing the cross-culvert on National Highway 20 at the B'Lao Sre intersection (Dai Lao commune), located nearly 1km from Bao Loc pass.

983af1eea31c14424d0d.jpg
Traffic congestion on National Highway 20 through Bao Loc City

At many times, hundreds of vehicles traveling from Da Lat to Ho Chi Minh City lined up waiting for about 4km from the B'Lao Sre intersection (Dai Lao commune) to the center of Loc Chau commune.

In the opposite direction, vehicles also lined up for more than 3km from the B'Lao Sre intersection down to the area of the Virgin Mary statue (in Bao Loc pass).

According to reports, the traffic congestion has been going on since early morning on June 28, and by noon of the same day, there was no sign of it cooling down. It took more than an hour for vehicles to travel through the road.

Although authorities have deployed forces to direct traffic, traffic is still very difficult due to the increase in the number of vehicles on the weekend.

>> Some images recorded on National Highway 20 through Bao Loc City:

eb1177453db78ae9d3a6.jpg
Mixed traffic queue waiting to pass through the sewer upgrade and repair area on Highway 20.
d25331ce753cc2629b2d.jpg
f2cda523e1d1568f0fc0.jpg
185d1ffe5a0ced52b41d.jpg
93011e8a5a78ed26b469.jpg
88276ab12e43991dc052.jpg
538d2cf67f04c85a9115.jpg
Construction site becomes a bottleneck, making traffic difficult
ec1364a02152960ccf43.jpg
4eb08066c49473ca2a85.jpg
Small vehicles like motorbikes have difficulty moving here.
bffd7d1039e28ebcd7f3.jpg
Authorities must regulate traffic from a distance to avoid more serious congestion.

It is known that the emergency repair project of the cross-culvert at the B'Lao Sre intersection on National Highway 20 is chaired by the Office of Road Management Area IV.1, Vietnam Road Administration, the construction unit is Vuong Tran Construction Trading and Service Co., Ltd. and 886 - Thanh Nam Construction Investment Joint Stock Company is the maintenance unit of the project. The project was started in late June 2025.

However, in the past 2 days, the construction and traffic regulation of the construction unit at this project have encountered shortcomings and limitations. The construction site has become a "bottleneck" causing the flow of traffic to be limited and traffic jams to last.

Source: https://www.sggp.org.vn/quoc-lo-20-qua-tp-bao-loc-ket-cung-phuong-tien-do-xay-dung-cong-post801534.html


Comment (0)

No data
No data
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together

Heritage

Figure

Business

No videos available

News

Political System

Local

Product