Vietnam.vn - Nền tảng quảng bá Việt Nam

Ho Chi Minh City adjusts traffic in District 1, preparing for the 30/4 holiday

Báo Giao thôngBáo Giao thông23/03/2025

In the coming time, Ho Chi Minh City will restrict traffic on Pasteur and Le Duan streets to construct a grandstand to organize activities to celebrate the 50th anniversary of the Liberation of the South and National Reunification Day.


Ho Chi Minh City will restrict traffic on Pasteur and Le Duan streets in Ben Nghe ward, District 1 to ensure order and traffic safety for the construction of stages and stands to organize activities to celebrate the 50th anniversary of the Liberation of the South and National Reunification Day (April 30, 1975 - April 30, 2025).

TP.HCM điều chỉnh giao thông quận 1, chuẩn bị cho đại lễ 30/4- Ảnh 1.

Ho Chi Minh City adjusts traffic in District 1 to prepare for the April 30th holiday.

Accordingly, phase 1: Gather equipment for each item at 30/4 Park; construct technical items and assemble stands B, C of the logistics area; assemble the base stand; assemble stand A and stand A tent. Time starts from March 22.

Construction site: Pasteur Street (section from Le Duan to Alexandre De Rhodes) , Ben Nghe Ward, District 1 .

Phase 2: From March 31 to May 12, construction site on Pasteur Street (from Han Thuyen to Le Duan) , Ben Nghe Ward, District 1.

Phase 3: Removing the median strip on Le Duan Street to serve the training, preliminary rehearsal, final rehearsal, and official parade. Time from April 17.

Location: Le Duan Street (from Nguyen Binh Khiem to Cong Xa Paris Roundabout) , Ben Nghe Ward, District 1.

Time for dismantling, site clearance and re-establishment is from May 1st to May 12th.

Traffic Police Department guides the alternative route as follows:

Direction 1 (for Phase 1 construction) : Pasteur – Le Duan – Pham Ngoc Thach (or Hai Ba Trung) – Vo Thi Sau – go towards District 3, Phu Nhuan, Tan Binh (airport)…

Direction 2: Pasteur – Nguyen Du – Truong Dinh – Nguyen Thi Minh Khai – Go to District 3, 5, 10… or go to Truong Dinh to Hoang Sa, Truong Sa.

Direction 3: Pasteur – Han Thuyen – Cong Xa Paris – Le Duan – go towards Binh Thanh District, Thu Duc City.

Direction 4: Pasteur – Ly Tu Trong – Ton Duc Thang – go towards Binh Thanh District, Thu Duc City.

Direction 5: Pasteur – Le Loi – Tran Hung Dao towards District 5, 11... or Le Loi – Le Lai – Pham Hong Thai – Cach Mang Thang Tam – towards District 3, 10, Tan Binh, Tan Phu...

Based on the actual situation, the Traffic Police Department will arrange forces to carry out traffic diversion appropriately, minimizing the impact on the daily lives of people traveling through this area.

Drivers participating in traffic through the above area and neighboring routes must reduce speed, comply with instructions from traffic police, traffic control forces or instructions from traffic signal systems on the road.



Source: https://www.baogiaothong.vn/tphcm-dieu-chinh-giao-thong-quan-1-chuan-bi-cho-dai-le-30-4-192250323203440242.htm

Comment (0)

No data
No data
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together

Heritage

Figure

Business

No videos available

News

Political System

Local

Product