Vietnam.vn - Nền tảng quảng bá Việt Nam

Soc Trang starts construction on another sand mine to supply the horizontal highway

Việt NamViệt Nam21/08/2024


According to records, the MS03 sand mine is located on the Hau River in Nhon My commune, Ke Sach district ( Soc Trang province) with an area of 60 hectares and a reserve of 1.1 million m3.

The total reserve of sand minerals allowed to be exploited is about 470,000m3; the allowed exploitation capacity is 470,000m3/7 months; the number of exploitation vehicles includes four HB500CV suction ships; the number of transportation vehicles is four barges.

Sóc Trăng khởi công thêm mỏ cát cung cấp cho cao tốc trục ngang- Ảnh 1.

Mr. Lam Van Man, Secretary of Soc Trang Provincial Party Committee (second from left) and Mr. Tran Van Lau, Chairman of Soc Trang Provincial People's Committee (middle) inspected the survey at MS03 sand mine on August 7.

The mining period for this mine is 7 months from August 15, and Construction Corporation No. 1 - JSC is the project owner.

Mining time during the day is from 7am to 5pm. The approved mining method is to use a sand pumping ship (HB 500CV), exploiting sand directly from the riverbed, bringing it to a side-by-side barge, transporting it to the landfill and consumption site.

The authorities also requested the project owner to arrange mining vehicles in a line along the length of the mine area. At the same time, divide each construction segment (about 284m/vehicle) from downstream to upstream, and carry out mining in the opposite direction of the flow.

This is one of five sand mines on the Hau River in Soc Trang province for which the Provincial People's Committee has prepared documents and procedures to hand over to contractors for exploitation according to a special mechanism to construct component project 4.

Previously, on the morning of August 15, at the MS01 sand mine on the Hau River, in Phong Nam and An Lac Tay communes, Ke Sach district (Soc Trang), Cuu Long Concrete Joint Stock Company also held a groundbreaking ceremony for sand exploitation to supply for the Chau Doc - Can Tho - Soc Trang expressway project, phase 1.

Sóc Trăng khởi công thêm mỏ cát cung cấp cho cao tốc trục ngang- Ảnh 2.

Sand mining area of Construction Corporation No. 1.

MS01 sand mine has an area of 34 hectares; the sand reserve allowed for exploitation is nearly 1.2 million m3, with exploitation period until the end of August 2028.

In early December 2023, the People's Committee of Soc Trang province held a handover ceremony of documents, locations, mining reserves, and environmental impact assessment reports of five sand mines to four contractors of this project to prepare documents and mining procedures according to a special mechanism.

The total area of sand mines handed over by the People's Committee of Soc Trang province to contractors is over 450 hectares, with a total reserve of over 11 million m3. All sand reserves exploited from these five mines are only for Component Project 4, Chau Doc - Can Tho - Soc Trang Expressway.

Four contractors were assigned sand mines: Truong Son Construction Corporation, package No. 11, assigned mine MS 05 (reserves 3.36 million m3); Hai Dang Joint Stock Company, package No. 10, assigned mine MS 11 (reserves nearly 2 million m3); Traffic Construction Corporation 5-CTCP, package No. 9, assigned mine MS 06 (reserves nearly 2 million m3); Construction Corporation No. 1-CTCP, package No. 12, assigned two mines (MS 03 and MS 14, with total reserves of more than 3.7 million m3).

Regarding the demand for sand, Truong Son Construction Corporation needs nearly 1.5 million m3; Hai Dang Joint Stock Company needs nearly 1.8 million m3. Meanwhile, Traffic Construction Corporation No. 5 needs nearly 1.9 million m3 and Construction Corporation No. 1 needs nearly 1.5 million m3.

Source: https://www.baogiaothong.vn/soc-trang-khoi-cong-them-mo-cat-cung-cap-cho-cao-toc-truc-ngang-192240821112834563.htm


Comment (0)

No data
No data
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky
Lotus blooming season attracts tourists to the majestic mountains and rivers of Ninh Binh
Cu Lao Mai Nha: Where wildness, majesty and peace blend together

Heritage

Figure

Business

No videos available

News

Political System

Local

Product