Vietnam.vn - Nền tảng quảng bá Việt Nam

Deputy Prime Minister Bui Thanh Son inspects two nuclear power plant projects in Khanh Hoa

On the morning of July 24, Deputy Prime Minister Bui Thanh Son led a Central working delegation to inspect the planning areas of Ninh Thuan 1 and Ninh Thuan 2 Nuclear Power Plants, located in Phuoc Dinh and Vinh Hai communes, Khanh Hoa province.

Báo Sài Gòn Giải phóngBáo Sài Gòn Giải phóng24/07/2025

Deputy Prime Minister Bui Thanh Son and the Central working delegation listened to a report on project information. Photo: HIEU GIANG
Deputy Prime Minister Bui Thanh Son and the Central working delegation listened to a report on project information. Photo: HIEU GIANG

The delegation included representatives from central ministries and branches. On the side of Khanh Hoa province, there was comrade Nghiem Xuan Thanh, member of the Party Central Committee, Secretary of the Provincial Party Committee, and leaders of relevant departments, branches and localities.

dasua-4.jpg
Deputy Prime Minister Bui Thanh Son and the Central working delegation listened to a report on project information. Photo: HIEU GIANG

The survey aims to review the current status of land and infrastructure, and listen to the thoughts and aspirations of people in the planning area, as a basis for ministries and branches to continue researching and orienting development in the coming time.

During the inspection, the Deputy Prime Minister also visited and presented gifts to a number of households in the project area.

dasua-1.jpg
Deputy Prime Minister Bui Thanh Son presents gifts to people in the project area. Photo: HIEU GIANG

According to the report of Khanh Hoa Provincial People's Committee, the total area recovered for the two projects according to Decision No. 794/QD-TTg dated June 8, 2015 of the Prime Minister is 1,279.52 hectares, related to 1,288 households with 4,911 people. However, according to updates from the locality, the current reality is 1,129.14 hectares, related to 1,153 households with 5,229 people.

dasua-3.jpg
Deputy Prime Minister Bui Thanh Son and the Central working delegation inspected the project site. Photo: HIEU GIANG

Specifically: Ninh Thuan 1 Nuclear Power Plant Project (Phuoc Dinh commune): area of 485.54ha, including factory area (409.53ha), resettlement area (64.85ha), cemetery (10.82ha), resettlement water supply system (0.34ha).

Ninh Thuan 2 Nuclear Power Plant Project (Vinh Hai Commune): area of 643.60ha, including factory area (404.5ha), resettlement area (54.4ha), residential improvement area (13.4ha), resettlement area (159.6ha), cemetery (11.45ha), pumping station (0.25ha).

After the site inspection, Deputy Prime Minister Bui Thanh Son and the working delegation will work with the Khanh Hoa Provincial People's Committee on the implementation of resettlement projects, serving the development planning and infrastructure preparation for two nuclear power projects.

Source: https://www.sggp.org.vn/pho-thu-tuong-bui-thanh-son-kiem-tra-thuc-dia-2-du-an-nha-may-dien-hat-nhan-tai-khanh-hoa-post805229.html


Comment (0)

No data
No data
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony
S-300PMU1 missiles on combat duty to protect Hanoi's sky

Heritage

Figure

Business

No videos available

News

Political System

Local

Product