Vietnam.vn - Nền tảng quảng bá Việt Nam

Quang Ngai assigns readiness to implement high-speed railway and highway projects

Quang Ngai province has assigned specific tasks to relevant units and is ready to implement high-speed railway projects and the Quang Ngai - Kon Tum expressway.

Báo Đầu tưBáo Đầu tư29/12/2024

Quang Ngai province's traffic infrastructure is gradually being completed.

Leaders of the Quang Ngai Department of Construction confirmed that the Department has reported on key transport infrastructure projects in the area that are about to be implemented. The focus is on the Quang Ngai - Kon Tum expressway project; the North - South high-speed railway project; Mang Den airport, Ly Son airport...

For the high-speed railway project, the Department of Construction has advised the Provincial People's Committee to assign specific tasks to departments, branches and the Provincial Party Committee Standing Committee to establish a steering committee for site clearance. At the same time, it is ready to implement according to the Government 's progress requirements.

Regarding the Quang Ngai - Kon Tum Expressway Project, the Department has received the dossier and continues to coordinate with Project Management Board 85 to implement it. Along with that, the locality has reviewed and added mineral mines to the planning to ensure the source of construction materials for the project, avoiding scarcity when starting construction.

Meanwhile, the two projects of Mang Den and Ly Son airports have been consulted by the Provincial People's Committee to work with the Ministry of Construction to approve the addition of the Mang Den airport planning to the master plan for the development of the national airport system for the period 2021-2030, with a vision to 2050 in a shortened order.

After the merger, Quang Ngai province has a very large traffic system of more than 1,560 km of roads of all kinds from district level and above. Of which, the national highway system has 6 routes with a length of 541 km; 24 provincial routes with a length of more than 866 km.

Regarding the Quang Ngai - Kon Tum Expressway Project, Mr. Nguyen Ngoc Sam, Vice Chairman of the Quang Ngai Provincial People's Committee assigned the Department of Construction to preside over and propose the selection of a unit to prepare a pre-feasibility study report and urgently advise the Provincial People's Committee to implement the next steps; study and refer to models of some localities to advise the Provincial People's Committee to direct, manage and organize implementation, ensuring progress according to the Government's requirements.

Source: https://baodautu.vn/quang-ngai-phan-cong-san-sang-thuc-hien-du-an-duong-sat-toc-do-cao-duong-bo-cao-toc-d327003.html


Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Local

Product